Difference between revisions of "Task assignement"

From Hall A Wiki
Jump to: navigation, search
 
 
(5 intermediate revisions by the same user not shown)
Line 1: Line 1:
#REDIRECT [[Task assignement August 15th 2010]]
+
Back to [[DVCS]]
 +
 
 +
Previous tables
 +
 
 +
[[Task assignement August 15th 2010]]
 +
 
 +
Experiment tasks
 +
*scalers
 +
*sync check
 +
*HV
 +
*HRS calibration
 +
*Beamline cablibration
 +
*dead time
 +
*lumi
 +
 
 +
 
 +
 
 +
{| align="left" border="1"
 +
!Name
 +
!Expertise
 +
!Secondary expert
 +
!Task list
 +
!Completion level / Completed / Left to be done
 +
!Estimated completion date
 +
! Main task
 +
|-
 +
|Alexandre Camsonne
 +
| ARS DAQ, Slow control, decoding, paperwork
 +
| Trigger
 +
|
 +
  * ARS test readout
 +
  * ARS final readout
 +
  * Buffering test
 +
  * DVCS HRS Trigger implementation
 +
  * Test decoder
 +
  * <s> Slow control LED </s>
 +
  * Slow control current ADC
 +
  * HRS integration
 +
  * <s>COO</s>
 +
  * <s>ESAD</s>
 +
  * <s>RSAD</s>
 +
  * TOSP
 +
|
 +
  * 100 % ( need implement checks and not working 100 % )
 +
  * 60 % ( crates being added )
 +
  * 90 % ( seems to work - need synch check )
 +
  * 60% (  )
 +
  * 70 % ( need implement checks - several ROCs)
 +
  * 100 % ( hardware ok - need write C functions driver and ROOT interface )
 +
  * 95 % ( Full test with calo )
 +
  * 80% ( waiting for crates to be in HRS )
 +
  * 90 % ( need edit files )
 +
  * 30 % ( need adapt to DVCS )
 +
  * 100 % ( Pavel waiting to send for signatures )
 +
  * 0 % ( still not found old one )
 +
|
 +
  * NA
 +
  * Aug 30 th
 +
  * in progress 08/25/2010
 +
  * 08/30/2010
 +
  * 08/30/2010
 +
  * 08/25/2010 ( 1 day )
 +
  * 08/30/2010 ( cabling needed )
 +
  * when everything in HRS, no later than september
 +
  * 08/25/2010
 +
  * 08/30/2010
 +
  * 09/5/2010
 +
  * 09/01/2010
 +
| Setup DVCS crates in HRS
 +
|-
 +
|Eric Fuchey
 +
| Calibration pi0, Photon Compton, RG213
 +
|
 +
|
 +
|
 +
| RG213
 +
|-
 +
|Florian Itard
 +
| Shift schedule, RG213
 +
|
 +
|
 +
|
 +
|
 +
|-
 +
|Magalie Magne
 +
| Electronics ARS + Calorimeter triggger
 +
|
 +
|
 +
|
 +
|
 +
|-
 +
| Hisham Albataineh
 +
|
 +
*RG213
 +
*BPMs cabling
 +
*Trigger cabling
 +
|
 +
| RG213
 +
|
 +
| RG213
 +
|-
 +
|Carlos Munoz
 +
| Software, Survey, (Elastic calibration ?),MySQL
 +
|
 +
|
 +
  *adaq software
 +
  *Waveform analysis
 +
  *Survey
 +
|
 +
|
 +
|-
 +
|Julie Roche
 +
| Software, curing, cosmics paddle
 +
| DVCS analysis on adaq
 +
|
 +
| DVCS analysis on adaq
 +
|
 +
|-
 +
|Charles Hyde
 +
| Run plan
 +
|
 +
| Run plan
 +
| Run plan
 +
|
 +
|
 +
|-
 +
| Robert Michaels
 +
| Helicity, HRS trigger, CompSimple
 +
|
 +
|
 +
*Helicity
 +
*HRS trigger
 +
*CompSimple
 +
|
 +
* 80 % - checks left ?
 +
* 50 % - reuse APEX - need Charles timing and logic diagrams - Magalie logic module to complete
 +
*
 +
|
 +
|
 +
|-
 +
|Sophia Iqbal ( until august 31st )
 +
| <s>Online GUI, EPICS start/end run</s>
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|-
 +
|Kalyan Allada
 +
| Lumi
 +
|
 +
|
 +
|
 +
|
 +
| Lumi
 +
}

Latest revision as of 05:35, 7 October 2010

Back to DVCS

Previous tables

Task assignement August 15th 2010

Experiment tasks

  • scalers
  • sync check
  • HV
  • HRS calibration
  • Beamline cablibration
  • dead time
  • lumi


Name Expertise Secondary expert Task list Completion level / Completed / Left to be done Estimated completion date Main task
Alexandre Camsonne ARS DAQ, Slow control, decoding, paperwork Trigger
 * ARS test readout
 * ARS final readout
 * Buffering test
 * DVCS HRS Trigger implementation
 * Test decoder
 *  Slow control LED 
 * Slow control current ADC
 * HRS integration
 * COO
 * ESAD
 * RSAD
 * TOSP
 * 100 % ( need implement checks and not working 100 % )
 * 60 % ( crates being added )
 * 90 % ( seems to work - need synch check )
 * 60% (  )
 * 70 % ( need implement checks - several ROCs)
 * 100 % ( hardware ok - need write C functions driver and ROOT interface )
 * 95 % ( Full test with calo )
 * 80% ( waiting for crates to be in HRS )
 * 90 % ( need edit files ) 
 * 30 % ( need adapt to DVCS )
 * 100 % ( Pavel waiting to send for signatures )
 * 0 % ( still not found old one )
 * NA
 * Aug 30 th
 * in progress 08/25/2010
 * 08/30/2010
 * 08/30/2010 
 * 08/25/2010 ( 1 day )
 * 08/30/2010 ( cabling needed )
 * when everything in HRS, no later than september
 * 08/25/2010
 * 08/30/2010
 * 09/5/2010
 * 09/01/2010 
Setup DVCS crates in HRS
Eric Fuchey Calibration pi0, Photon Compton, RG213 RG213
Florian Itard Shift schedule, RG213
Magalie Magne Electronics ARS + Calorimeter triggger
Hisham Albataineh
  • RG213
  • BPMs cabling
  • Trigger cabling
RG213 RG213
Carlos Munoz Software, Survey, (Elastic calibration ?),MySQL
 *adaq software
 *Waveform analysis
 *Survey
Julie Roche Software, curing, cosmics paddle DVCS analysis on adaq DVCS analysis on adaq
Charles Hyde Run plan Run plan Run plan
Robert Michaels Helicity, HRS trigger, CompSimple
  • Helicity
  • HRS trigger
  • CompSimple
  • 80 % - checks left ?
  • 50 % - reuse APEX - need Charles timing and logic diagrams - Magalie logic module to complete
Sophia Iqbal ( until august 31st ) Online GUI, EPICS start/end run
Kalyan Allada Lumi Lumi

}