Difference between revisions of "Tuesday, September 21, 11:00am ETD"
From Hall A Wiki
(New page: == Agenda == * new results for the upstream torus layout - [http://ace.phys.virginia.edu:8080/MollerSpectrometer/172 elog 172], [http://ace.phys.virginia.edu:8080/MollerSpectrometer/174 el...) |
(→Minutes) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
== Agenda == | == Agenda == | ||
− | + | # Summary of August 31 Magnet Meeting - see [http://www.jlab.org/~crowder/moller_stuff/summary_magnet_meeting_8-31-2010.pdf summary talk] | |
− | + | # New inelastic results for the "blocky actual" model - see [http://www.jlab.org/~mcnulty/mollerPlots/plots_prop1ToscaBA.html Dustin's webpage] | |
− | + | # defining keep-out zones - see [http://ace.phys.virginia.edu:8080/MollerSpectrometer/173 elog 173], [http://ace.phys.virginia.edu:8080/MollerSpectrometer/175 elog 175] | |
− | + | # new results for the upstream torus layout - [http://ace.phys.virginia.edu:8080/MollerSpectrometer/172 elog 172], [http://ace.phys.virginia.edu:8080/MollerSpectrometer/174 elog 174] | |
− | + | # Discussion | |
+ | # Other items not mentioned above | ||
== Minutes == | == Minutes == | ||
− | + | # Magnet Meeting summary | |
− | + | <br> Went through the slides; there were a few comments about things that should be added and KK agreed to follow up with the engineer that had not sent comments. Someone mentioned that we need to specify rad-hard epoxy. Juliette will follow up with meetings with the engineers about the water-cooling and the concepts for the supports. Roger mentioned that the calculations for the voltage and the power should be re-done for the new conceptual layout.<br> | |
− | + | # blocky actual inelastic plots | |
− | + | <br> Dustin showed the inelastic plots for the blocky actual model. | |
− | + | # keep-out zones | |
+ | # upstream torus layout | ||
+ | # Discussion | ||
+ | # Other items | ||
<br><br> Return to [[MOLLER at 11 GeV E09-005]] | <br><br> Return to [[MOLLER at 11 GeV E09-005]] |
Latest revision as of 14:00, 7 October 2010
Agenda
- Summary of August 31 Magnet Meeting - see summary talk
- New inelastic results for the "blocky actual" model - see Dustin's webpage
- defining keep-out zones - see elog 173, elog 175
- new results for the upstream torus layout - elog 172, elog 174
- Discussion
- Other items not mentioned above
Minutes
- Magnet Meeting summary
Went through the slides; there were a few comments about things that should be added and KK agreed to follow up with the engineer that had not sent comments. Someone mentioned that we need to specify rad-hard epoxy. Juliette will follow up with meetings with the engineers about the water-cooling and the concepts for the supports. Roger mentioned that the calculations for the voltage and the power should be re-done for the new conceptual layout.
- blocky actual inelastic plots
Dustin showed the inelastic plots for the blocky actual model.
- keep-out zones
- upstream torus layout
- Discussion
- Other items
Return to MOLLER at 11 GeV E09-005