Difference between revisions of "Tuesday, September 21, 11:00am ETD"
From Hall A Wiki
(→Minutes) |
|||
Line 11: | Line 11: | ||
# Magnet Meeting summary | # Magnet Meeting summary | ||
+ | <br> Went through the slides; there were a few comments about things that should be added and KK agreed to follow up with the engineer that had not sent comments. Someone mentioned that we need to specify rad-hard epoxy. Juliette will follow up with meetings with the engineers about the water-cooling and the concepts for the supports. Roger mentioned that the calculations for the voltage and the power should be re-done for the new conceptual layout.<br> | ||
# blocky actual inelastic plots | # blocky actual inelastic plots | ||
+ | <br> Dustin showed the inelastic plots for the blocky actual model. | ||
# keep-out zones | # keep-out zones | ||
# upstream torus layout | # upstream torus layout |
Latest revision as of 14:00, 7 October 2010
Agenda
- Summary of August 31 Magnet Meeting - see summary talk
- New inelastic results for the "blocky actual" model - see Dustin's webpage
- defining keep-out zones - see elog 173, elog 175
- new results for the upstream torus layout - elog 172, elog 174
- Discussion
- Other items not mentioned above
Minutes
- Magnet Meeting summary
Went through the slides; there were a few comments about things that should be added and KK agreed to follow up with the engineer that had not sent comments. Someone mentioned that we need to specify rad-hard epoxy. Juliette will follow up with meetings with the engineers about the water-cooling and the concepts for the supports. Roger mentioned that the calculations for the voltage and the power should be re-done for the new conceptual layout.
- blocky actual inelastic plots
Dustin showed the inelastic plots for the blocky actual model.
- keep-out zones
- upstream torus layout
- Discussion
- Other items