Difference between revisions of "Online analysis: results and TODO"
(→Trigger efficiency) |
(→Boiling test) |
||
Line 10: | Line 10: | ||
=Luminosity, efficiency= | =Luminosity, efficiency= | ||
==Boiling test== | ==Boiling test== | ||
− | Initial calibration on 10-17 owl shift: [[http://www.jlab.org/~adaq/halog/html/1010_archive/101017080925.html shift summary]] | + | Initial calibration on 10-17 owl shift: [[http://www.jlab.org/~adaq/halog/html/1010_archive/101017080925.html shift summary]][[https://hallaweb.jlab.org/wiki/index.php/Image:Dvcs2_boiling_test_10-15.pdf inital plan]] |
==Trigger efficiency== | ==Trigger efficiency== |
Revision as of 13:20, 17 October 2010
Back to DVCS
This page is in progress, please new items to it. When you obtain a result, log in into the Halog and link it to this page. if you are willing to take charge of a given analysis, please indicate it on this page as well as the date at which you are starting to work on it.
Contents
Matching data taking with run plans
- Update the how to
- Maintain db_run.dat file: Make sure that every LHRS momentum and angle changes are logged (Florian Itard is keeping up with that)
- Start a database of run indicating line by line the run number, the target in position, the average beam current, LHRs pnom, LHRS angle, the purpose of the run
Luminosity, efficiency
Boiling test
Initial calibration on 10-17 owl shift: [shift summary][inital plan]
Trigger efficiency
Analyze data taken on the week-end of 10-09 and 10-10 with T3 and T4 trigger and also data taken around 10-14. Online analysis by B. Michaels [here]. Malek Mazouz is working on the offline study (starting on 10-16)
LHRS commissioning
Calibrate the ADCs:
Still to be done S1, Pion rejector, (Shloka is working on that)
[Cerenkov], [S2 (done 10-09)]
Calibrate detector time spectra:
Still to be done : understand timing spectra for S1,S2 and the Cerenkov
[t0 for VDC (done 10-09)]
Evaluate PID efficiency:
Here is an example of such an analysis hallaweb.jlab.org/data_reduc/AnaWork2003/patricia.ps.gz P. Solvignon, 2003
LHRS optics run (no sieve/sieve)
Ye Zhihong is interested in this analysis and started it.
- [Summary of runs so far]
- [Initial invariant masses on LH2]
- [5 passes beam sieve holes on C foils and LH2]
DVCS Calorimeter
Beam
BPM calibration
BCM calibration
- the initial calibration was done on 10-14. It needs to be analyzed. Asked Hisham on 10-14 if he wants to look at it, waiting on his answer [halog]
Beam energy measurement
- the initial measurement was done on 10-15: [halog]