Difference between revisions of "Setup as installed"
From Hall A Wiki
(→Target) |
|||
(4 intermediate revisions by the same user not shown) | |||
Line 6: | Line 6: | ||
==Target== | ==Target== | ||
− | + | [[http://www.jlab.org/~adaq/halog/html/1010_archive/101018115553.html here]] | |
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
==Left HRS == | ==Left HRS == | ||
Line 33: | Line 23: | ||
== Lumi readout== | == Lumi readout== | ||
[http://www.jlab.org/~kalyan/dvcs/dvcs_lumi.gif[Lumi readout by K. Allada]] | [http://www.jlab.org/~kalyan/dvcs/dvcs_lumi.gif[Lumi readout by K. Allada]] | ||
+ | |||
+ | == Triggers == | ||
+ | T1 (S2) | ||
+ | |||
+ | T2 (S0) | ||
+ | |||
+ | T3 (S1.and.S2) | ||
+ | |||
+ | T4 (efficiency trigg.) [(S1.and.C).or.(S2.and.C)].and.NOT(S1.and.S2) | ||
+ | |||
+ | T5 (S2 and a calo validation), need more info here | ||
+ | |||
+ | == ARS == | ||
+ | [https://hallaweb.jlab.org/wiki/index.php/Image:ARS_DAQ_DVCS2_September2010.pdf[Magali Magne has installed proposition 2 of the following document | ||
+ | ]] |
Latest revision as of 14:57, 18 October 2010
Back to DVCS
Bellow is the setup we have decided on.
Target
[here]
Left HRS
- S0
- S1
- S2
- Short Cerenkov
- Pion rejector
Calorimeter
Blocks: The beam is at right hand when you stand at the back of the calorimeter facing the target.
DVCS Calo blocks.jpg
Lumi readout
Triggers
T1 (S2)
T2 (S0)
T3 (S1.and.S2)
T4 (efficiency trigg.) [(S1.and.C).or.(S2.and.C)].and.NOT(S1.and.S2)
T5 (S2 and a calo validation), need more info here
ARS
[https://hallaweb.jlab.org/wiki/index.php/Image:ARS_DAQ_DVCS2_September2010.pdf[Magali Magne has installed proposition 2 of the following document ]]