Difference between revisions of "Lead glass cal."
From Hall A Wiki
(2 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
*from the patch there are two sets of signals that go to the V792 QDC: | *from the patch there are two sets of signals that go to the V792 QDC: | ||
− | 1. The ADC cables. Approx. 170ns | + | 1. The ADC cables. (ribbon cables) Approx. 170ns |
− | 2. | + | 2. The lead glass trigger cables. They are processed through a discriminator |
+ | and a sequence of logic units followed by a short delay and then the translator. | ||
+ | It is then connected to the V792 by a ribbon cable. The signal reaches the | ||
+ | V792 QDC about 20-30ns before the ADC cables. | ||
+ | |||
+ | [[Image:caladc.jpg]] |
Latest revision as of 13:14, 26 October 2010
- from the patch there are two sets of signals that go to the V792 QDC:
1. The ADC cables. (ribbon cables) Approx. 170ns 2. The lead glass trigger cables. They are processed through a discriminator and a sequence of logic units followed by a short delay and then the translator. It is then connected to the V792 by a ribbon cable. The signal reaches the V792 QDC about 20-30ns before the ADC cables.