Difference between revisions of "Online analysis: results and TODO"
(→Matching data taking with run plans) |
(→Matching data taking with run plans) |
||
Line 7: | Line 7: | ||
* Maintain db_run.dat file: Make sure that every LHRS momentum and angle changes are logged (Florian Itard is keeping up with that) | * Maintain db_run.dat file: Make sure that every LHRS momentum and angle changes are logged (Florian Itard is keeping up with that) | ||
* Database of run indicating line by line the run number, the target in position, the average beam current, LHRs pnom, LHRS angle, the purpose of the run | * Database of run indicating line by line the run number, the target in position, the average beam current, LHRs pnom, LHRS angle, the purpose of the run | ||
− | [[Statistic summary]] | + | [/u/home/cshloka/public_html/halla[Statistic summary]] |
=Luminosity, efficiency= | =Luminosity, efficiency= |
Revision as of 16:50, 2 November 2010
Back to DVCS
This page is in progress, please new items to it. When you obtain a result, log in into the Halog and link it to this page. if you are willing to take charge of a given analysis, please indicate it on this page as well as the date at which you are starting to work on it.
Contents
Matching data taking with run plans
- Update the how to
- Maintain db_run.dat file: Make sure that every LHRS momentum and angle changes are logged (Florian Itard is keeping up with that)
- Database of run indicating line by line the run number, the target in position, the average beam current, LHRs pnom, LHRS angle, the purpose of the run
[/u/home/cshloka/public_html/halla[Statistic summary]]
Luminosity, efficiency
Boiling test
Initial calibration on 10-17 owl shift: [shift summary][initial plan]
Second calibration on 10-21 swing shift: [run list]
Trigger efficiency
Analyze data taken on the week-end of 10-09 and 10-10 with T3 and T4 trigger and also data taken around 10-14. Online analysis by B. Michaels [here]. Malek Mazouz is working on the offline study (starting on 10-16)
Run7711 T3 and T4 Triggers
S0 hit pattern vs x and y (at vdc) shows efficiency in excess of 99% except at extreme ends of focal plane halog entry 336817 http://www.jlab.org/~adaq/halog/html/1010_archive/101026122751.html
Cut script saved at /adaqfs/home/adaq/dvcs/onlana/GoodHRS.h TCut cGoodVDC = "L.tr.n==1&&abs(L.tr.x)<1."; TCut cGoodAngles = "abs(L.tr.tg_th)<0.1&&abs(L.tr.tg_ph)<0.05"; TCut cTarget = "abs(L.tr.tg_y)<0.1"; TCut cCleanTrk = cGoodVDC&&cGoodAngles&&cTarget;
Deadtime
- Buffered mode (10-28): [this halog]
- info about livetime from TS registers [this halog]
LHRS commissioning
Calibrate the ADCs:
Still to be done S1, Pion rejector, (Shloka is working on that)
[Cerenkov], [S2 (done 10-09)]
Calibrate detector time spectra:
Still to be done : understand timing spectra for S1,S2 and the Cerenkov
Evaluate PID efficiency:
- November 1: [online results] result in [lowering the threshold]
LHRS optics run (no sieve/sieve)
Ye Zhihong is interested in this analysis and started it.
- [Summary of runs so far]
- [Initial invariant masses on LH2]
- [5 passes beam sieve holes on C foils and LH2]
LHRS acceptance check
[delta scan on 10-22] need to be analyzed
DVCS Calorimeter
- two photon invariant mass: [10-24]
Elastic calibration
- 4 passes : [October 26 Day], [October 26 Swing]
Beam
BPM calibration
BCM calibration
Beam energy measurement
- the initial measurement was done on 10-15: [halog]
Helicity
- ring map file
- runs with TSettle as trigger:
Polarization
- Sign:
- Polarization sign: [same sign HV in or OUT??]
- Polarization sign: [same sign HV in or OUT??]
- Moeller
- Compton