(New page: === Cell Installed, Arp 04, 2010 === * Name: Boris == Oven Test == == Heater Test == Oven is tested on Mar 24, 2010 without cell. Gas flow is 5~6 in mechanical meter, 508 on digital me...) |
|||
Line 1: | Line 1: | ||
+ | === TODO List === | ||
+ | |||
+ | * {{pass |Clean and organize target lab}} | ||
+ | |||
+ | * {{pass |Around He3 Cell}} | ||
+ | ** {{pass |Oven positioning}} | ||
+ | ** {{pass |Holding field hardware}} | ||
+ | ** {{pass |Air flow test}} | ||
+ | ** {{pass |Heater test}} | ||
+ | ** {{pass |Setup RTD reader}} | ||
+ | ** {{pass |Setup spectrometer}} | ||
+ | ** {{pass |Install He3 cell}} | ||
+ | ** {{pass |Install target chamber pickup coils}} | ||
+ | ** {{pass |Attach RTDs}} | ||
+ | |||
+ | * {{pass |Laser Subsystem}} | ||
+ | ** {{pass |Cleaning optics stuff}} | ||
+ | ** {{pass |[[Target_Lab_Main#1.2F4-Wave_Plate_Calibration | Q-wave plate calibration]]}} | ||
+ | ** {{pass |Install optics}} | ||
+ | ** {{pass |low power alignment}} | ||
+ | ** {{pass |High power check}} | ||
+ | ** {{pass |Optical Pumping Operational}} | ||
+ | |||
+ | * NMR Polarimetery | ||
+ | ** {{pass |NMR RF Delivery}} | ||
+ | ** {{pass |Pumping chamber pick up coil setup}} | ||
+ | ** {{pass |Target chamber pick up coil setup}} | ||
+ | ** {{pass |pick up coil alignment}} | ||
+ | ** {{pass |NMR code}} | ||
+ | ** {{pass |NMR Operational}} | ||
+ | ** {{warning|water NMR}} | ||
+ | |||
+ | * {{pass |EPR Polarimetery}} | ||
+ | ** {{pass |EPR RF Delivery}} | ||
+ | ** {{pass |D2 light collection}} | ||
+ | ** {{pass |EPR code}} | ||
+ | ** {{pass |EPR line shape}} | ||
+ | ** {{pass |EPR frequency lock}} | ||
+ | ** {{pass |EPR Operational}} | ||
+ | |||
=== Cell Installed, Arp 04, 2010 === | === Cell Installed, Arp 04, 2010 === | ||
Latest revision as of 17:15, 7 December 2010
Contents
TODO List
- Clean and organize target lab
- Around He3 Cell
- Oven positioning
- Holding field hardware
- Air flow test
- Heater test
- Setup RTD reader
- Setup spectrometer
- Install He3 cell
- Install target chamber pickup coils
- Attach RTDs
- Laser Subsystem
- Cleaning optics stuff
- Q-wave plate calibration
- Install optics
- low power alignment
- High power check
- Optical Pumping Operational
- NMR Polarimetery
- NMR RF Delivery
- Pumping chamber pick up coil setup
- Target chamber pick up coil setup
- pick up coil alignment
- NMR code
- NMR Operational
- water NMR
- EPR Polarimetery
- EPR RF Delivery
- D2 light collection
- EPR code
- EPR line shape
- EPR frequency lock
- EPR Operational
Cell Installed, Arp 04, 2010
- Name: Boris
Oven Test
Heater Test
Oven is tested on Mar 24, 2010 without cell. Gas flow is 5~6 in mechanical meter, 508 on digital meter.
- If turn on the constant heater only (set temperature -> 20C), heater temp reached 212C, oven reached 154C
Air Flow meter Calibration @ Mar 9, 2010
Air flow meter in oven control chassis is cross calibrated with mechanical air flow meter at target.
Mechanical Flow Meter | Digital Flow Meter |
---|---|
1 | 260 |
3 | 390 |
5 | 490 |
7 | 600 |
Alarm 4 is set at 280.