Difference between revisions of "Agenda and Minutes for 2011/02/09"
From Hall A Wiki
Line 8: | Line 8: | ||
* todo | * todo | ||
− | ** Mauri is working on | + | ** Mauri is working on having header files built into rpm. |
** Mauri is trying to have a total absorber material in the code. | ** Mauri is trying to have a total absorber material in the code. | ||
− | ** Mauri is | + | ** Mauri is fixing a bug which Simona found to be a limit of char size of detector type name |
** other work in progress. | ** other work in progress. |
Revision as of 15:46, 9 February 2011
- progress
- Simona had Cherenkov SIDIS geometry in database. She is working on tweaking the mirror design. There's a limit from the yoke radius. What will be the height of beam line which will limit the yoke radius? We can't dig a hole in the hall, can we?
- Paul generated different filed map for BaBar,CDF,ZEUS magnet with Possion program. Zhiwen has converted them into GEMC map. refer to Magnet coil and yoke and Magnetic_Field_Map
- Lorenzo have event generator output in LUND format. we are testing it. refer to event generator
- Zhiwen is working on baffle and acceptance study. refer to Baffle
- Zhiwen is working on calorimeter and trying to run W/SciFi simulation code.
- our database "soliddb" is online, Zhiwen is testing it and will release once it's ready.
- todo
- Mauri is working on having header files built into rpm.
- Mauri is trying to have a total absorber material in the code.
- Mauri is fixing a bug which Simona found to be a limit of char size of detector type name
- other work in progress.