<B>2/09/2011</B>:
 +
Present : Kalyan, Jixie, Melissa, Min, Chao, Pengjia, Jianping, Karl(phone), Alex,
 +
 +
*Alex: Found out some electronic device (preamplifier) broken through BCM test. Alex and Pengjia will try to test it again after it fixed.
 +
 +
*Penjia:
 +
1) Penjia is looking into the analyzer get information of BCM|BPM from PREX
 +
data. Documentation is hard to find. Alex will help to search for some document.
 +
 +
*JP:
 +
1) BPM: should push to have BPM electronic tested. JP recently found out that
 +
there is one super-harp and one regular harp in HallA. The super hard can have
 +
a resolution of micrometer level, but the regular one is estimated to have the
 +
resolution of 800 mocrometers.  G2P need to have 2 super-harp, which is costly.
 +
He suggensted to seek for improvement or better solution.
 +
 
 +
2) Suggested to do a survey for the target field if possible.
 +
 +
*Jixie:
 +
1)Upgrate the G4 simulation program to add septum entrance window and sieve slit.  Jixie tried to use the G4 program to get the rates for optics but not ready
 +
to get result yet.
 +
2)Jixie will get rates by Thursday from single arm simulation program.
 +
 +
 +
*Min:
 +
1) Min showed her simulation result about the optics rate.  Some small problem need to be solved. She will work with Jixie to get the final rates out. 
 +
 +
*Kalyan:
 +
1) Continue working on checking the possibility for the 3rd arm. He is looking
 +
into the real data to get the dilution factor.
 +
 +
 +
 +
 +
----
 
<B>2/09/2011</B>:  
 
<B>2/09/2011</B>:  
 
Present : Kalyan, Jixie, Melissa, Min Huang, Chao Gu, Pengjia Zhu, Jianping Chen, Karl(phone), Alex
 
Present : Kalyan, Jixie, Melissa, Min Huang, Chao Gu, Pengjia Zhu, Jianping Chen, Karl(phone), Alex

Revision as of 17:14, 16 February 2011

Minutes of the weekly analysis meetings

2/09/2011: Present : Kalyan, Jixie, Melissa, Min, Chao, Pengjia, Jianping, Karl(phone), Alex,

  • Alex: Found out some electronic device (preamplifier) broken through BCM test. Alex and Pengjia will try to test it again after it fixed.
  • Penjia:

1) Penjia is looking into the analyzer get information of BCM|BPM from PREX data. Documentation is hard to find. Alex will help to search for some document.

  • JP:

1) BPM: should push to have BPM electronic tested. JP recently found out that there is one super-harp and one regular harp in HallA. The super hard can have a resolution of micrometer level, but the regular one is estimated to have the resolution of 800 mocrometers. G2P need to have 2 super-harp, which is costly. He suggensted to seek for improvement or better solution.

2) Suggested to do a survey for the target field if possible.

  • Jixie:

1)Upgrate the G4 simulation program to add septum entrance window and sieve slit. Jixie tried to use the G4 program to get the rates for optics but not ready to get result yet. 2)Jixie will get rates by Thursday from single arm simulation program.


  • Min:

1) Min showed her simulation result about the optics rate. Some small problem need to be solved. She will work with Jixie to get the final rates out.

  • Kalyan:

1) Continue working on checking the possibility for the 3rd arm. He is looking into the real data to get the dilution factor.




2/09/2011: Present : Kalyan, Jixie, Melissa, Min Huang, Chao Gu, Pengjia Zhu, Jianping Chen, Karl(phone), Alex

  • Pengjia:

1) Finish cabling for the cavity BPM in the hall. This cavity BPM has been used in PREX, we are now going to test it to see if it works for G2P and how well it goes. 2) Kalyan raise question about the signal splitter of the BCM if it is an active one or passive one. This splitter was used to split BCM signal into 2 lines: one is connected to the counting house another stays in the hall. Need to ask Alex|John or do a measurement to verify this. 3) Alex or John will work on the BPM test plan 4) JP suggested Penjia looking into the PREX data for the BPM block to learn about the BPM.

Min: 1) Min showed the status about studying MUDIFI. This is a configuration file to control the trajectory: http://www.jlab.org/~mhuang/g2p/mudifi/g2p_traj2.dat (This file was also used by SNAKE to create the trjectories. For detail how to read this file, refer to the SNAKE MENU https://jlabsvn.jlab.org/svnroot/halla/groups/g2p/SNAKE/Snake_manual.pdf )


Jian-ping: 1) Draft of the run plan is ready. 2) Need to decide what kind of target we want and provide the information to the target group in a week. Jixie need to work hard to get a the result quickly.

Jixie: 1) Confirm with Josh what the current target stick design is. How many target cells we can have: is it 4 large cell + 2 small cell? (2 large cells for NH3, 1 large cell for cross? 1 large cell remains empty for beam tuning?......) A)Is there any space below the bottom of the stick to use as the empty target? B)We need to find out what king of design we want and tell them.

2) Jixie need to check the following quickly: A)need to study how the target thickness affect resolution (run single arm simulation) B)Run simulation to decide what target is best for optics, C12, CH2 or Ta? (check rates, angle resolution ...)

3) Working on the Geant4 simulation: A) Continue working on the radiation background project, need beam dump shape and geometry information B) Add the following exist HRS transportation packages: (Septum+HRS) and HRS. Later on will add TargetField+HRS) and (TargetFiled+Septum+HRS) if they are ready


2/02/2011: Present : Kalyan, Jixie, Alex, Min, Pengjia, Jianping, Karl(phone)

  • Kalyan:

1) Kalyan is searching for possibility to place a 3rd arm to detector either the elastic electron or elastic proton (or both). This time he showed the estimate rates to detect the electrons at 42 degrees. Please refer to https://hallaweb.jlab.org/dvcslog/g2p/11 for details.

2) He also showed some real data at 45 degrees from BigBite http://www/~kalyan/g2p/meetings/02feb2011/

Summary: a) Electron detection at 42deg is only good for 1.1GeV, for rest of energies the rates are very low(its hopeless) b) Protons can be detected around 75deg but the S/N is very low. So may need to put a small scintillator at small angle to give coincidence with hadron arm and reduce background.

JP: 1) Discuss if we need to run Compton at such a low current. Considering the facts that A)tuning the beam through the Compton chicane always takes time, B)the Compton may not work efficiently in such a low current and low beam energy c)It takes longer time to run moller if the beam go through the Compton chicane we may not want to run Compton during G2P. But we may run it for 3.3 GeV beam at the end if time allows.

2) Discuss about the NMR coils. We did not understand the uncertainty and effects of the "uniform" NMR or that of the "edge" NMR. He suggested to verify which is better and what is the effects compare to the EG4 data. We need to run simulation to understand the radiation effect of that. A quick way i


  • Pengjia:

1) Plan to write tech note for the Beam Position Measurement 2) He gave a presentation about beam position calibration, see the slice here: http://www.jlab.org/~pzhu/report0202.pptx


  • Min:

1) Will work on the 3rd arm with Kalyan, she will look into the Bigbite performance in the SRC experiment 2) Continue working on snake and MUDIFI program

  • Jixie:

1) Show some visualization figures for the Geant4 simulation. Currently there is some bug on the transverse configuration. Jixie is working on that. 2) Will simulate the NMR coil for radiation.



1/26/2011: Present : Kalyan, Jixie, Melissa, Alex, Min, Pengjia, Jianping, Karl(phone)

  • Jixie:

1)The coil will block almost half of the acceptance of one arm for the configuration that the field is 80 degrees with the beam and HRS at 6 degrees. Refer to https://hallaweb.jlab.org/dvcslog/g2p/9 for details. For HRS at 12.5 degrees, only single arm data will be available. Need to mention this to Doug and Guy. Alan is waiting for the decision to finalize the design for the scattering chamber entrance window. 2)Still waiting for input of beam dump for the Geant4 simulation

For 74 degree and solid angle 60 mSr: The elastic Pr rate is about 4 kHz; the total inelastic rate for Pr in momentum range 0.25-0.4 is about 270 kHz.

Need to find out a way to reduce the inelastic rates. Increase the momentum range to 0.280Gev/c may help...

  • Jp: About the BCM|BPM of the beam line, Jlab may pay 60K for it???
  • Pengjia: Talked about the target cooling took place at UVA. The

maximum field provided by UVA solenoid is 5.0032 Tesla. He showed some pictures of the solenoid, the microwave generator, the pump system. The target was cooled down pretty smooth. He will summarized it and put it onto the web for next meeting.

  • Min: Working on the MULDFI program. Discussing the effects introduced by the 2cm raster. Angle resolution is more important than the position resolution.



1/19/2011: Present : Kalyan, Jixie, Melissa, Karl, Min

  • Kalyan : Working on third arm elastic rates. Looking at 2 options,

both on beam left: 1) Bigbite detecting protons at 74 degrees. Issues: manpower to install, no identified power supply and possible issue of overtaxing the power budget to the hall (Ed Folts). Guy may have power supply at Berkely. Jixie will follow up to see if power budget is real problem. 2) A small calorimeter at 42 degrees to be used as electron detector on the platform about 2 m from the can. Pros: simple design, little tech support needed. Cons: rate will be very low. PMTs near target field might have problems. Goal is to have a decision to present at the next collab meeting.

  • Jixie: Working on the Geant4 simulation. Has created scattering

chamber and included the UVa target field map. Waiting for more information on the beam dump design. Initial goal is to look at radiation in the hall. Intermediate goal is to look at acceptance blockage by the target coils. Later, will be able to look at physics and issue of radiative tails at low Q2. Jixie will talk to Whitney Armstrong from Temple who created a geant 4 simulation of the target for SANE. Jixie is working with Min on SNAKE. John having difficulty to transfer code from solaris to linux. Will talk to Doug about impact of acceptance blockage on gep (target at 80 deg) for 12.5 degrees scattering.

  • Min: Working on the fitting for SNAKE. Also interested to get

involved with the 3rd arm study.

  • Melissa: Starting to look at target and detectors.
  • All: Discussion of manpower and projects in need of manpower.