Difference between revisions of "Agenda and Minutes for 2011/10/26"
From Hall A Wiki
(Link to new wiki) |
|||
(2 intermediate revisions by one other user not shown) | |||
Line 1: | Line 1: | ||
+ | This page has been moved to [https://solid.jlab.org/wiki/index.php/Agenda_and_Minutes_for_2011/10/26 https://solid.jlab.org/wiki/index.php/Agenda_and_Minutes_for_2011/10/26] in the new [https://solid.jlab.org/wiki SoLID Wiki]. Please do not edit this page. | ||
+ | |||
* Seamus | * Seamus | ||
− | * | + | *# Update on new Baffle design [[Baffle Design]] |
− | * | + | *# Ray traced baffle designs for CLEO and comparisons with previous design [https://userweb.jlab.org/~riordan/20111026/index.html]. |
− | * Lorenzo - Neutron background | + | * Lorenzo - Neutron background: CLEO solenoid design completed [http://hallaweb.jlab.org/12GeV/SoLID/download/neutron/cleo_solenoid.jpg] [http://hallaweb.jlab.org/12GeV/SoLID/download/neutron/cleo_shield_atnow.jpg]. We discussed the strategy for implementing the shielding configuration. |
+ | * Eric - Cherenkov: Update on his work in progress in order to determine a figure of merit for the Cherenkov detector. |
Latest revision as of 15:40, 7 December 2020
This page has been moved to https://solid.jlab.org/wiki/index.php/Agenda_and_Minutes_for_2011/10/26 in the new SoLID Wiki. Please do not edit this page.
- Seamus
- Update on new Baffle design Baffle Design
- Ray traced baffle designs for CLEO and comparisons with previous design [1].
- Lorenzo - Neutron background: CLEO solenoid design completed [2] [3]. We discussed the strategy for implementing the shielding configuration.
- Eric - Cherenkov: Update on his work in progress in order to determine a figure of merit for the Cherenkov detector.