Difference between revisions of "Agenda and Minutes for 2012/02/15"

From Hall A Wiki
Jump to: navigation, search
(New page: * CLEO magnet Zhiwen showed some details of the current CLEO magnet design. It's in a good shape and we should proceed with baffle and other subsystems with the new magnet. [http://hallaw...)
 
(Link to new wiki)
 
(2 intermediate revisions by one other user not shown)
Line 1: Line 1:
 +
This page has been moved to [https://solid.jlab.org/wiki/index.php/Agenda_and_Minutes_for_2012/02/15 https://solid.jlab.org/wiki/index.php/Agenda_and_Minutes_for_2012/02/15] in the new [https://solid.jlab.org/wiki SoLID Wiki].  Please do not edit this page.
 +
 
* CLEO magnet  
 
* CLEO magnet  
Zhiwen showed some details of the current CLEO magnet design. It's in a good shape and we should proceed with baffle and other subsystems with the new magnet.
+
Zhiwen showed some details of the current CLEO magnet design. It's in a good shape and we should proceed with baffle and other subsystems with the new magnet.  
[http://hallaweb.jlab.org/12GeV/SoLID/download/field/talk/CLEO_magnet_yoke_zwzhao_20120215.pptx pptx] [http://hallaweb.jlab.org/12GeV/SoLID/download/field/talk/CLEO_magnet_yoke_zwzhao_20120215.pdf pdf]
+
[http://hallaweb.jlab.org/12GeV/SoLID/download/field/talk/CLEO_magnet_yoke_zwzhao_20120215.pptx pptx] [http://hallaweb.jlab.org/12GeV/SoLID/download/field/talk/CLEO_magnet_yoke_zwzhao_20120215.pdf pdf] ( There are more slides than what were shown in the meeting. )
 
+
 
* For GEM readout design, Nilanga needs some input from tracking by sometime in April.
 
* For GEM readout design, Nilanga needs some input from tracking by sometime in April.
 
 
* Before the next collaboration meeting (4/13-14), we will have a couple of extended weekly meetings to cover subsystem in details. we shall decide on dates soon and send out reminders.
 
* Before the next collaboration meeting (4/13-14), we will have a couple of extended weekly meetings to cover subsystem in details. we shall decide on dates soon and send out reminders.

Latest revision as of 15:40, 7 December 2020

This page has been moved to https://solid.jlab.org/wiki/index.php/Agenda_and_Minutes_for_2012/02/15 in the new SoLID Wiki. Please do not edit this page.

  • CLEO magnet

Zhiwen showed some details of the current CLEO magnet design. It's in a good shape and we should proceed with baffle and other subsystems with the new magnet. pptx pdf ( There are more slides than what were shown in the meeting. )

  • For GEM readout design, Nilanga needs some input from tracking by sometime in April.
  • Before the next collaboration meeting (4/13-14), we will have a couple of extended weekly meetings to cover subsystem in details. we shall decide on dates soon and send out reminders.