Difference between revisions of "Run Plan (DVCS3)"

From Hall A Wiki
Jump to: navigation, search
(Commissioning/ Calibration)
 
(200 intermediate revisions by 3 users not shown)
Line 1: Line 1:
== Commissioning/ Calibration ==
+
For the 12 GeV DVCS experiment, go to [[https://hallaweb.jlab.org/wiki/index.php/DVCS3 DVCS3 wiki ]]. <br>
=== Beam instruments ===
+
==== BCM ====
+
==== BPMs====
+
==== Moeller ====
+
==== Compton ====
+
==== Helicity reporting ====
+
  
=== Luminosity ===
 
====Target Boiling ====
 
====Deadtime check ====
 
  
=== HRS ===
+
For the Fall of 2016 (FY2017), we plan on taking the kinematics 36_2, 36_3 and as many of the  60_* ones as we can.
  
=== Calorimeter ===
 
==== DC readings ====
 
==== Elastic Calibration ===
 
  
==12 GeV Era Run Schedule ==
+
[[Image:Fall2016.jpg | 1200px]]
youplal
+
  
==12 GeV Era Run Schedule ==
+
[[Fall 2016 optic plans]]
more of that
+
  
==12 GeV Era Run Schedule ==
+
[[Fall 2016 calorimeter calibration (elastic)]]
and even more
+
 
 +
<hr>
 +
<hr>
 +
<hr>
 +
<hr>

Latest revision as of 16:58, 2 November 2016

For the 12 GeV DVCS experiment, go to [DVCS3 wiki ].


For the Fall of 2016 (FY2017), we plan on taking the kinematics 36_2, 36_3 and as many of the 60_* ones as we can.


Fall2016.jpg

Fall 2016 optic plans

Fall 2016 calorimeter calibration (elastic)