Difference between revisions of "Sunday, December 7: DAY Shift"
From Hall A Wiki
(New page: Go back to Daily Run Plan Daily Run Plans * General considerations ** Tanja Horn is the current Run Coordinator. Please contact directly via RC phone 757-876-1787 ** Follow the generic...) |
|||
(One intermediate revision by the same user not shown) | |||
Line 6: | Line 6: | ||
** In general, Hall technical staff should not be contacted by the shift crew - please call the RC first. | ** In general, Hall technical staff should not be contacted by the shift crew - please call the RC first. | ||
** The target operator is required to supervise the cryo-target. | ** The target operator is required to supervise the cryo-target. | ||
− | |||
** Make sure to use the <b>DVCS CODA configuration</b> for all runs (<b>even when taking single arm HRS data</b>). | ** Make sure to use the <b>DVCS CODA configuration</b> for all runs (<b>even when taking single arm HRS data</b>). | ||
Line 12: | Line 11: | ||
** Ion chamber calibration for LH2 target | ** Ion chamber calibration for LH2 target | ||
** Change configuration for [https://hallaweb.jlab.org/wiki/index.php/Run_Plan_%28DVCS3%29#Elastic_Calibration elastic calibration], LH2 target, 5 uA, no raster | ** Change configuration for [https://hallaweb.jlab.org/wiki/index.php/Run_Plan_%28DVCS3%29#Elastic_Calibration elastic calibration], LH2 target, 5 uA, no raster | ||
− | ** | + | ** Take elastic calibration data |
Latest revision as of 19:22, 7 December 2014
Go back to Daily Run Plan Daily Run Plans
- General considerations
- Tanja Horn is the current Run Coordinator. Please contact directly via RC phone 757-876-1787
- Follow the generic Instructions for shift takers
- Shift leaders: Please make sure to fill out the beam time accounting form and write a "Shift Summary" log entry at the end of your shift regardless if there is beam or not.
- In general, Hall technical staff should not be contacted by the shift crew - please call the RC first.
- The target operator is required to supervise the cryo-target.
- Make sure to use the DVCS CODA configuration for all runs (even when taking single arm HRS data).
- Instructions for this shift
- Ion chamber calibration for LH2 target
- Change configuration for elastic calibration, LH2 target, 5 uA, no raster
- Take elastic calibration data