Difference between revisions of "Run summary for commissioning in fall 2014"

From Hall A Wiki
Jump to: navigation, search
 
(4 intermediate revisions by the same user not shown)
Line 14: Line 14:
 
| 2.918
 
| 2.918
 
| 22.8
 
| 22.8
 +
|Optics calibration
 
|-
 
|-
 
|10412-10414
 
|10412-10414
Line 21: Line 22:
 
| 2.918
 
| 2.918
 
| 22.8
 
| 22.8
 +
|Optics calibration
 
|-
 
|-
 
|10513-10517
 
|10513-10517
Line 37: Line 39:
 
| 22.8
 
| 22.8
 
| Misc. triggers
 
| Misc. triggers
 +
|-
 +
|10684-10688
 +
|No
 +
|15cm LH2
 +
|7.4
 +
|3.200
 +
|33.4
 +
|ps1=ps7=1 ps2-6=50
 +
|-
 +
|10690-10698
 +
|No
 +
|15cm LH2
 +
|7.4
 +
|3.200
 +
|33.4
 +
|ps1=ps7=1 ps2-6=50
 
|-
 
|-

Latest revision as of 12:58, 9 January 2015

Run number Sieve Target Ebeam (GeV) P0 (GeV) theta (degree) Comment
10389-10397 Yes Multi-foil carbon 7.3 2.918 22.8 Optics calibration
10412-10414 No Multi-foil carbon 7.3 2.918 22.8 Optics calibration
10513-10517 No 15cm LH2 7.4 2.710 22.8 DVCS trigger was not fully disabled; Misc. triggers
10518-10521 No 15cm LH2 7.4 2.710 22.8 Misc. triggers
10684-10688 No 15cm LH2 7.4 3.200 33.4 ps1=ps7=1 ps2-6=50
10690-10698 No 15cm LH2 7.4 3.200 33.4 ps1=ps7=1 ps2-6=50