Difference between revisions of "Thursday, June 25, 2015 2:00pm EST"
From Hall A Wiki
(→Minutes) |
|||
(One intermediate revision by the same user not shown) | |||
Line 22: | Line 22: | ||
* Pre R&D request discussion (see Jim's email) | * Pre R&D request discussion (see Jim's email) | ||
− | ** | + | ** subsystem spreadsheet sent to Rolf; phone call with KK and Mark |
− | ** | + | ** prototype not pre-R&D, other things needed proper wording |
− | ** | + | ** Jim and Rolf had a follow-up call |
− | ** | + | ** Settled on a draft to send to Javier; we'll review |
− | + | ||
− | + | ||
* Status reports | * Status reports | ||
** Juliette/Sakib/Iris | ** Juliette/Sakib/Iris | ||
** KK/Tyler - [https://hallaweb.jlab.org/wiki/images/d/dd/NTL_envelopeUpdate.pdf envelopes] | ** KK/Tyler - [https://hallaweb.jlab.org/wiki/images/d/dd/NTL_envelopeUpdate.pdf envelopes] | ||
− | ** Jim/Ernie/Jason | + | ** Jim/Ernie/Jason - new conductor layout should be pinned down before Advisory Group meeting |
* Next meeting(s) | * Next meeting(s) | ||
** "integration and assembly" meeting - today | ** "integration and assembly" meeting - today | ||
+ | *** Costing for design, engineering, integration and assembly | ||
+ | *** add Level 3 items | ||
+ | **** Vacuum chamber, etc. | ||
+ | ** special call on July 7 at 2pm EST | ||
** internal group to be invited to regular meeting for update July 9th | ** internal group to be invited to regular meeting for update July 9th | ||
** Advisory group meeting July 22nd, 23rd (half day at JLAB) (not scheduled yet) | ** Advisory group meeting July 22nd, 23rd (half day at JLAB) (not scheduled yet) | ||
− | ** Collaboration meeting Aug | + | ** Collaboration meeting Aug 12-13 |
+ | ** meeting for collimators at end of July/early August | ||
<br><br> Return to [[Teleconferences]] | <br><br> Return to [[Teleconferences]] | ||
<br> Return to [[MOLLER at 11 GeV E09-005]] | <br> Return to [[MOLLER at 11 GeV E09-005]] |
Latest revision as of 14:49, 25 June 2015
Last meeting: Wednesday, June 10, 2015 1:30pm EST
Agenda
- Pre R&D request discussion (see Jim's email)
- Status reports
- Juliette/Sakib/Iris
- KK/Tyler - envelopes
- Jim/Ernie/Jason
- Next meeting(s)
- "integration and assembly" meeting - today
- internal group to be invited to regular meeting for update July 9th
- Advisory group meeting July 22nd, 23rd (half day at JLAB) (not scheduled yet)
- Collaboration meeting Aug 11-13?
Minutes
Attending: Juliette, Jim, Jason, KK
- Pre R&D request discussion (see Jim's email)
- subsystem spreadsheet sent to Rolf; phone call with KK and Mark
- prototype not pre-R&D, other things needed proper wording
- Jim and Rolf had a follow-up call
- Settled on a draft to send to Javier; we'll review
- Status reports
- Juliette/Sakib/Iris
- KK/Tyler - envelopes
- Jim/Ernie/Jason - new conductor layout should be pinned down before Advisory Group meeting
- Next meeting(s)
- "integration and assembly" meeting - today
- Costing for design, engineering, integration and assembly
- add Level 3 items
- Vacuum chamber, etc.
- special call on July 7 at 2pm EST
- internal group to be invited to regular meeting for update July 9th
- Advisory group meeting July 22nd, 23rd (half day at JLAB) (not scheduled yet)
- Collaboration meeting Aug 12-13
- meeting for collimators at end of July/early August
- "integration and assembly" meeting - today
Return to Teleconferences
Return to MOLLER at 11 GeV E09-005