Difference between revisions of "Run Plan (DVCS3)"

From Hall A Wiki
Jump to: navigation, search
 
(16 intermediate revisions by 3 users not shown)
Line 1: Line 1:
For the 12 GeV DVCS experiment, go to [[https://hallaweb.jlab.org/wiki/index.php/DVCS3 DVCS3 wiki ]].
+
For the 12 GeV DVCS experiment, go to [[https://hallaweb.jlab.org/wiki/index.php/DVCS3 DVCS3 wiki ]]. <br>
  
For this Winter 2016 we are only scheduled for 10 week. Therefore we estimate that we will only be able to take the data points highlighted in green.
 
  
Run plan, Beam Energies include Injector Energy
+
For the Fall of 2016 (FY2017), we plan on taking the kinematics 36_2, 36_3 and as many of the  60_* ones as we can.
*[[Image:DVCS-kin-E12-06-114_2016_Injector.xlsx.pdf | 1000 px]]
+
  
  
[[Winter 2016 optic plans]]
+
[[Image:Fall2016.jpg | 1200px]]
  
[[Winter 2016 calorimeter calibration (elastic)]]
+
[[Fall 2016 optic plans]]
  
[[https://logbooks.jlab.org/files/2015/05/3338049/LH2runplan-dwh.pdf  Target boiling]]
+
[[Fall 2016 calorimeter calibration (elastic)]]
  
[[Fall 2014 run plan]]
+
<hr>
 
+
<hr>
Previous version without injector energy:
+
<hr>
[[Image:DVCS-kin-E12-06-114 02-10-16.jpg | 100px]]
+
<hr>

Latest revision as of 16:58, 2 November 2016

For the 12 GeV DVCS experiment, go to [DVCS3 wiki ].


For the Fall of 2016 (FY2017), we plan on taking the kinematics 36_2, 36_3 and as many of the 60_* ones as we can.


Fall2016.jpg

Fall 2016 optic plans

Fall 2016 calorimeter calibration (elastic)