Difference between revisions of "SoLID Weekly : Monday, February 15, 2016 9:30am EDT"

From Hall A Wiki
Jump to: navigation, search
(Agenda)
(Link to new wiki)
 
(2 intermediate revisions by one other user not shown)
Line 1: Line 1:
 +
This page has been moved to [https://solid.jlab.org/wiki/index.php/Weekly_:_Monday,_February_15,_2016_9:30am_EDT https://solid.jlab.org/wiki/index.php/Weekly_:_Monday,_February_15,_2016_9:30am_EDT] in the new [https://solid.jlab.org/wiki SoLID Wiki].  Please do not edit this page.
 +
 
Link to the Meeting page [[Meeting solid]] <br/>
 
Link to the Meeting page [[Meeting solid]] <br/>
 
Last meeting: [[SoLID Weekly : Monday, February 8, 2016 9:30am EDT]]
 
Last meeting: [[SoLID Weekly : Monday, February 8, 2016 9:30am EDT]]
Line 24: Line 26:
 
  Implement ECAL in the new GEMC framework based simulation - Rakitha, Zhiwen  
 
  Implement ECAL in the new GEMC framework based simulation - Rakitha, Zhiwen  
 
To do PVDIS Cerenkov + ECAL trigger study
 
To do PVDIS Cerenkov + ECAL trigger study
 +
Excess Pion production in Geant4 - Rakitha (Finish by end of 2016)
 
 
 
</pre>
 
</pre>
Line 30: Line 33:
  
 
Present:<br/>
 
Present:<br/>
 
+
Rakitha, Alex, Paul, Vince, Seamus, Lorenzo, Zhihong, Rich
 
== Minutes ==
 
== Minutes ==
 
+
* Addressing comments from JLab management about the funding supplemental documents
 +
**
  
 
== Misc.==
 
== Misc.==

Latest revision as of 15:38, 7 December 2020

This page has been moved to https://solid.jlab.org/wiki/index.php/Weekly_:_Monday,_February_15,_2016_9:30am_EDT in the new SoLID Wiki. Please do not edit this page.

Link to the Meeting page Meeting solid
Last meeting: SoLID Weekly : Monday, February 8, 2016 9:30am EDT

The teleconference info is as follows:
       Phone #: +1-888-240-2560 or +1-408-740-7256 and See International Numbers
       Code: 	8540081197
       Computer : blujeans-browser
       Date and Location: Weekly Monday at 9:30AM in CEBAF center F226 (announcement in solid emaillist) 

Agenda

  • List of simulation goals
 Complete the PVDIS ECAL Trigger Study with new backgrounds - Rakitha (Finish before end of February 2016)
	 Obtain the ECAL trigger rates
	 Obtain the ECAL trigger curves	
 Complete the PVDIS Cerenkov Trigger Study with new backgrounds - Rakitha, Zhiwen, Micheal 
	 Can Micheal re-do previous Cerenkov trigger study with new backgrounds? (Finish before end of February 2016)
	 Otherwise implement the Cerenkov in GEMC correctly and complete the study (Finish by Summer 2016)
 If Micheal can repeat his Cerenkov analysis, then using singles trigger rates from ECAL and Cerenkov regenerate the pre-CDR trigger tables - Rakitha (Finish before end of February 2016)
 Implement the SIDIS ECAL (large and forward angles) in new new GEMC framework based simulation - Rakitha (Finish by Summer 2016)
	 Obtain the ECAL trigger rates
	 Obtain the ECAL trigger curves	
 Implement ECAL in the new GEMC framework based simulation - Rakitha, Zhiwen 
	 To do PVDIS Cerenkov + ECAL trigger study
 Excess Pion production in Geant4 - Rakitha (Finish by end of 2016)
	


Present:
Rakitha, Alex, Paul, Vince, Seamus, Lorenzo, Zhihong, Rich

Minutes

  • Addressing comments from JLab management about the funding supplemental documents

Misc.