Difference between revisions of "Run Plan (DVCS3)"

From Hall A Wiki
Jump to: navigation, search
 
(10 intermediate revisions by 3 users not shown)
Line 2: Line 2:
  
  
For this Winter 2016 we are only scheduled for 10 week. Therefore we estimate that we will only be able to take the following kinematics: kin_36_[2-3] and kin_48_*
+
For the Fall of 2016 (FY2017), we plan on taking the kinematics 36_2, 36_3 and as many of the  60_* ones as we can.
  
Run plan, Beam Energies include Injector Energy
 
*[[Image:DVCS e12-06-114 kinematic feb1216.jpg | 1000 px]]
 
  
 +
[[Image:Fall2016.jpg | 1200px]]
  
[[Winter 2016 optic plans]]
+
[[Fall 2016 optic plans]]
  
[[Winter 2016 calorimeter calibration (elastic)]]
+
[[Fall 2016 calorimeter calibration (elastic)]]
  
 
+
<hr>
----
+
<hr>
 
+
<hr>
[[Fall 2014 run plan]]
+
<hr>

Latest revision as of 16:58, 2 November 2016

For the 12 GeV DVCS experiment, go to [DVCS3 wiki ].


For the Fall of 2016 (FY2017), we plan on taking the kinematics 36_2, 36_3 and as many of the 60_* ones as we can.


Fall2016.jpg

Fall 2016 optic plans

Fall 2016 calorimeter calibration (elastic)