(New page: Go back to Daily Run Plan Daily Run Plans * General considerations ** <b>Specific mission</b> * Note: * Detailed instructions [https://hallaweb.jlab.org/ here] <b>BPM/Spot++ Chec...)
 
 
(7 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
Go back to Daily Run Plan [[Daily Run Plans]]
 
Go back to Daily Run Plan [[Daily Run Plans]]
* General considerations
+
 
**  
+
 
 +
<b>Previously...</b>
 +
* Complete energy measurement with series of Hall-A magnet (mapping)<br>
 +
- HALOG [https://logbooks.jlab.org/entry/3387270]
 +
* RF recovery done, Prepare the BCM calibration (not happened due to delay restoring the beam)
 +
* Set up beam through Compton chicane
 +
 
 +
 
 +
 
 +
 
 +
 
  
 
<b>Specific mission</b>
 
<b>Specific mission</b>
* Note:  
+
* Note:
 +
1/  Set up beam through Compton chicane<br>
 +
- Ciprian, Greg and Yves  are tuning the beam through Compton<br>
 +
- HALOG [https://logbooks.jlab.org/entry/3387530]
 +
- Before tune the beam, observe the beam current (how much actually we can get tonight but only up to 30uA)
 +
- Spoke to Ciprian/Greg/Dave and they gave a specific monitoring instruction (shift crew will post everything).
 +
- We will give a try ...
 +
 
 +
2/ Expect some production runs through Compton <br>
 +
 +
3/ Agreement with Hall-D and Talked PD to set up the BCM calibration tomorrow<br>
 +
- Crucial: high beam current 30uA with FC & empty target <br>
 +
 
 +
Instruction:
 +
[http://hallaweb.jlab.org/equipment/BCM/HallA_BCM_linearity.pdf DOC1][http://hallaweb.jlab.org/equipment/BCM/HallA_Unser_0L02_cal.pdf DOC2]
 +
<br>
 +
- Experts on call (Dave/Julie/Thir/...)
 +
- Calo. HV off<br>
 +
 
  
* Detailed instructions [https://hallaweb.jlab.org/ here]
 
  
  
 
<b>BPM/Spot++ Check</b>
 
<b>BPM/Spot++ Check</b>
 
* After beam lost for considerable time (like beam study, pass change,...)
 
* After beam lost for considerable time (like beam study, pass change,...)
* Ask MCC to run 5uA wth carborn hole target and make sure you can see the hole through Spot++
+
* Ask MCC to run 5uA wth carbon hole target and make sure you can see the hole through Spot++
  
 
***[https://hallaweb.jlab.org/wiki/index.php/Beamline Beamline commissioning how-to.]
 
***[https://hallaweb.jlab.org/wiki/index.php/Beamline Beamline commissioning how-to.]

Latest revision as of 23:05, 3 March 2016

Go back to Daily Run Plan Daily Run Plans


Previously...

  • Complete energy measurement with series of Hall-A magnet (mapping)
- HALOG [1]
  • RF recovery done, Prepare the BCM calibration (not happened due to delay restoring the beam)
  • Set up beam through Compton chicane




Specific mission

  • Note:

1/ Set up beam through Compton chicane

- Ciprian, Greg and Yves  are tuning the beam through Compton
- HALOG [2] - Before tune the beam, observe the beam current (how much actually we can get tonight but only up to 30uA) - Spoke to Ciprian/Greg/Dave and they gave a specific monitoring instruction (shift crew will post everything). - We will give a try ...

2/ Expect some production runs through Compton

3/ Agreement with Hall-D and Talked PD to set up the BCM calibration tomorrow

- Crucial: high beam current 30uA with FC & empty target 

Instruction: DOC1DOC2
- Experts on call (Dave/Julie/Thir/...) - Calo. HV off



BPM/Spot++ Check

  • After beam lost for considerable time (like beam study, pass change,...)
  • Ask MCC to run 5uA wth carbon hole target and make sure you can see the hole through Spot++