<b>Previously...</b>
 
<b>Previously...</b>
 
* Production data (Kin48_3)
 
* Production data (Kin48_3)
 
+
* Set up the beam through Compton chicane
  
  
Line 11: Line 11:
 
*** Continue production mode ***
 
*** Continue production mode ***
  
<b> last update Feb 29</b>
+
<b> last update Mar 06</b>
 
* Polarized beam at 15 uA on LH2 15 cm  through Compton chicane !  
 
* Polarized beam at 15 uA on LH2 15 cm  through Compton chicane !  
* DVCS is running kin_48_3 [[https://hallaweb.jlab.org/wiki/index.php/Run_Plan_%28DVCS3%29 here]], as off 02-29 10 am we have accumulate 1 C out of our goal of 4.7 C.
+
* DVCS is running kin_48_3 [[https://hallaweb.jlab.org/wiki/index.php/Run_Plan_%28DVCS3%29 here]], as off 03-06 5 pm we have accumulate 2.14 C out of our goal of 4.7 C.
 
* LHRS is partially detuned: [[https://logbooks.jlab.org/entry/3384965 here]]
 
* LHRS is partially detuned: [[https://logbooks.jlab.org/entry/3384965 here]]
 
  - LHRS=2.92GeV, Q1/Q2/Q3=1916.640(readout:1900)/1600/1600 (Q1 regul.OFF)<br>
 
  - LHRS=2.92GeV, Q1/Q2/Q3=1916.640(readout:1900)/1600/1600 (Q1 regul.OFF)<br>

Latest revision as of 12:26, 7 March 2016

Go back to Daily Run Plan Daily Run Plans


Previously...

  • Production data (Kin48_3)
  • Set up the beam through Compton chicane


Specific mission

      • Continue production mode ***

last update Mar 06

  • Polarized beam at 15 uA on LH2 15 cm through Compton chicane !
  • DVCS is running kin_48_3 [here], as off 03-06 5 pm we have accumulate 2.14 C out of our goal of 4.7 C.
  • LHRS is partially detuned: [here]
- LHRS=2.92GeV, Q1/Q2/Q3=1916.640(readout:1900)/1600/1600 (Q1 regul.OFF)
- PreScaleR : PS1=PS2=PS3=1, && PS8=200
- PreScaleL : PS9 =1, + DVCS config.
  • beam locks: no position lock, energy lock in Arc 2: [here]
  • the straw chambers in the LHRS are off
  • DVCS daq configuration is [this one], we are measuring about 2% DT at 15uA.
  • Take Compton run every 2 h






BPM/Spot++ Check

  • After beam lost for considerable time (like beam study, pass change,...)
  • Ask MCC to run 5uA wth carbon hole target and make sure you can see the hole through Spot++




Please check more info on the white board in the Counting House ~!!