(New page: Go back to Daily Run Plan Daily Run Plans <b>Previously...</b> * restore beam (NL vacuum/cooling issue) * ARC energy measurement <br> <b>Specific mission</b> *Note: <br> 1/ HARP s...) |
|||
(3 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
Go back to Daily Run Plan [[Daily Run Plans]] | Go back to Daily Run Plan [[Daily Run Plans]] | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
<b>Specific mission</b> | <b>Specific mission</b> | ||
− | * | + | * Production on LH2 |
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
DVCS: Kin_48_4<br> | DVCS: Kin_48_4<br> |
Latest revision as of 01:26, 2 April 2016
Go back to Daily Run Plan Daily Run Plans
Specific mission
- Production on LH2
DVCS: Kin_48_4
- 15uA
- LH2 target
- DVCS ON
- Calo_theta= 10.1(deg), Distance = 2.5m (from target) - LHRS=3.36GeV, angle=24.925(deg), Q1/Q2/Q3=1916.640(readout:1900)/1600/1600 (Q1 regul.OFF)
- RHRS=2.204GeV, angle=48.75(deg)
- PreScaleR : PS1=PS2=PS3=1, && PS8=200
- PreScaleL : PS9 =1, + DVCS config.
- Raster : 2x2mm^2
BPM/Spot++ Check
- After a period of 3 hours or more without beam (like beam study, pass change,...) ask MCC to run 5uA 2 by 2 rastered beam on the carbon hole target and make sure you can see the hole (use Spot++ to analyze the C hole run)