Difference between revisions of "Sunday, Apr. 3: DAY Shift"

From Hall A Wiki
Jump to: navigation, search
(New page: Go back to Daily Run Plan Daily Run Plans <b>Specific mission</b> * Production on LH2 DVCS: Kin_48_4<br> - 15uA<br> - LH2 target<br> - DVCS ON<br> - Calo_theta= 10.1(deg), Distan...)
 
 
(One intermediate revision by the same user not shown)
Line 15: Line 15:
 
  - Raster : 2x2mm^2  
 
  - Raster : 2x2mm^2  
  
 +
<b>Calibrations</b>
 +
* Optics target run
  
  

Latest revision as of 10:54, 3 April 2016

Go back to Daily Run Plan Daily Run Plans

Specific mission

  • Production on LH2

DVCS: Kin_48_4

- 15uA
- LH2 target
- DVCS ON
- Calo_theta= 10.1(deg), Distance = 2.5m (from target) - LHRS=3.36GeV, angle=24.925(deg), Q1/Q2/Q3=1916.640(readout:1900)/1600/1600 (Q1 regul.OFF)
- RHRS=2.204GeV, angle=48.75(deg)
- PreScaleR : PS1=PS2=PS3=1, && PS8=200
- PreScaleL : PS9 =1, + DVCS config.

- Raster : 2x2mm^2

Calibrations

  • Optics target run


BPM/Spot++ Check

  • After a period of 3 hours or more without beam (like beam study, pass change,...) ask MCC to run 5uA 2 by 2 rastered beam on the carbon hole target and make sure you can see the hole (use Spot++ to analyze the C hole run)