Difference between revisions of "Monday, Apr. 4: DAY Shift"

From Hall A Wiki
Jump to: navigation, search
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
 
Go back to Daily Run Plan [[Daily Run Plans]]
 
Go back to Daily Run Plan [[Daily Run Plans]]
  
<b>Tentative</b>
+
<b>Accelerator DOWN</b>
* With Yves help send beam through the Compton chicane - check for updates on running conditions
+
  
  
 
<b>Specific mission</b>
 
<b>Specific mission</b>
* Production on LH2
+
* DVCS calorimeter calibration runs - 2 pass
  
DVCS: Kin_48_4<br>
 
- 15uA<br>
 
- LH2 target<br>
 
- DVCS ON<br>
 
- Calo_theta= 10.1(deg), Distance = 2.5m (from target)
 
- LHRS=3.36GeV, angle=24.925(deg), Q1/Q2/Q3=1916.640(readout:1900)/1600/1600 (Q1 regul.OFF)<br>
 
- RHRS=2.204GeV, angle=48.75(deg)<br>
 
- PreScaleR : PS1=PS2=PS3=1, && PS8=200<br>
 
- PreScaleL : PS9 =1, + DVCS config.<br><br>
 
- Raster : 2x2mm^2
 
  
 +
DVCS:
  
 +
LH2 target, unrastered beam (which means beam current 5 uA - not more than 5 !!!).
 +
 +
LHRS in positive polarity.
 +
 +
Open LHRS collimator
 +
 +
DAQ: DVCS config
 +
 +
angle LHRS= 38.04 deg
 +
 +
momentum LHRS= 2.127 GeV
 +
 +
beam energy= 4.5 GeV
 +
 +
We will take about 1 hour beam with three calorimeter angles: 26.5, 25 and 23.5 deg.
 +
 +
 
<b>General Info</b>
 
<b>General Info</b>
  

Latest revision as of 17:10, 4 April 2016

Go back to Daily Run Plan Daily Run Plans

Accelerator DOWN


Specific mission

  • DVCS calorimeter calibration runs - 2 pass


DVCS:

LH2 target, unrastered beam (which means beam current 5 uA - not more than 5 !!!).

LHRS in positive polarity.

Open LHRS collimator

DAQ: DVCS config

angle LHRS= 38.04 deg

momentum LHRS= 2.127 GeV

beam energy= 4.5 GeV

We will take about 1 hour beam with three calorimeter angles: 26.5, 25 and 23.5 deg.


General Info


Harp scan

When in need of asking MCC for a harp scan don't forget to mention that the raster should be OFF.


Beam centering

Before starting checking the beam (the profile with harp scans, its centering with the raster target or the C hole target, etc.) don't forget to turn OFF the DVCS calo HV, and also the HV on the VDCs. When ready for production don't forget to turn them back on.


BPM/Spot++ Check

  • After a period of 3 hours or more without beam (like beam study, pass change,...) ask MCC to run 5uA 2 by 2 rastered beam on the carbon hole target and make sure you can see the hole (use Spot++ to analyze the C hole run)