Difference between revisions of "Thursday, Apr. 7: DAY Shift"
From Hall A Wiki
(New page: ====Shift Status Notice==== Chance of CW beam during this shift: '''shift is on stand-by''' * TO '''must''' report to shift. * Remaining crew '''must''' stay in the area. ** Notify RC of c...) |
|||
(One intermediate revision by the same user not shown) | |||
Line 1: | Line 1: | ||
+ | Return to [[Daily_Run_Plans|List of Daily Run Plans]] | ||
+ | |||
====Shift Status Notice==== | ====Shift Status Notice==== | ||
− | + | MCC is hopeful that CW beam could be delivered by mid-shift. '''shift is on stand-by''' | |
* TO '''must''' report to shift. | * TO '''must''' report to shift. | ||
* Remaining crew '''must''' stay in the area. | * Remaining crew '''must''' stay in the area. | ||
Line 14: | Line 16: | ||
====If Beam Returns==== | ====If Beam Returns==== | ||
* Perform Beam After Extended Downtime procedure from below | * Perform Beam After Extended Downtime procedure from below | ||
− | * Perform extended ~20 minute Carbon Hole run (only '''once''') | + | <!-- * Perform extended ~20 minute Carbon Hole run (only '''once''') --> |
* Proceed with Production data taking. | * Proceed with Production data taking. | ||
− | + | ||
− | + | ||
====Beam After Extended Downtime==== | ====Beam After Extended Downtime==== | ||
This procedure is to be | This procedure is to be | ||
Line 42: | Line 43: | ||
*** If not centered ask MCC to move beam accordingly (check board for coordinates) | *** If not centered ask MCC to move beam accordingly (check board for coordinates) | ||
*** Repeat test with different beam position until target is centered. | *** Repeat test with different beam position until target is centered. | ||
+ | * Raster Target | ||
+ | ** Start the same settings as carbon hole centering | ||
+ | ** Move to Raster Target (mask target motion!) | ||
+ | ** Ask MCC for 5uA beam with Raster ON (2x2) | ||
+ | ** Check rates and confirm they are consistent with rates seen during HOME position | ||
+ | *** If the rates are low and consistent, then move on to next step | ||
+ | *** If the rates are high, it may indicate the beam has an angle that causes the beam to scrape on an edge of the target | ||
+ | **** Notify the RC | ||
+ | **** Ask MCC to readjust bpm positions until this angle is removed | ||
+ | **** When done, perform another Carbon Hole run just to be sure. | ||
+ | <!-- | ||
====Extended Carbon Hole Run==== | ====Extended Carbon Hole Run==== | ||
This is to be performed only '''once''' and may be skipped if already performed in previous shift. | This is to be performed only '''once''' and may be skipped if already performed in previous shift. | ||
Line 56: | Line 68: | ||
** Ask MCC for 5 μA beam | ** Ask MCC for 5 μA beam | ||
** Take ~20 minute run with this setting. | ** Take ~20 minute run with this setting. | ||
+ | |||
+ | --> | ||
====Production Running==== | ====Production Running==== | ||
− | For the remainder of the shift take 1 hour runs in the production configuration | + | For the remainder of the shift take 1 hour runs in the production configuration '''DVCS: Kin_48_2''' |
− | DVCS: Kin_48_2 | + | {| |
− | + | |Beam current | |
− | + | |15 μA | |
− | + | |- | |
+ | |Target | ||
+ | |LH2 | ||
+ | |- | ||
+ | |Raster | ||
+ | |ON (2x2mm<sup>2</sup>) | ||
+ | |- | ||
+ | |VDC HV (both arms) | ||
+ | |ON | ||
+ | |- | ||
+ | |DVCS Calo HV | ||
+ | |ON | ||
+ | |- | ||
+ | |DVCS Calo Angle; | ||
+ | |15.185° | ||
+ | |- | ||
+ | |DVCS Calo Distance | ||
+ | | 2.0 m | ||
+ | |- | ||
+ | |LHRS Polarity | ||
+ | |Negative | ||
+ | |- | ||
+ | |LHRS Momentum | ||
+ | |3.996 GeV/c | ||
+ | |- | ||
+ | |LHRS Angle | ||
+ | |20.243° | ||
+ | |- | ||
+ | |LHRS Q1 Current | ||
+ | |1916.640 (regulator '''OFF''') | ||
+ | |- | ||
+ | |LHRS DAQ Config | ||
+ | |DVCS | ||
+ | |- | ||
+ | |prescaleL | ||
+ | | PS9=1 (all others zero) | ||
+ | |- | ||
+ | |RHRS Polarity | ||
+ | |Negative | ||
+ | |- | ||
+ | |RHRS Momentum | ||
+ | |2.101 GeV/c | ||
+ | |- | ||
+ | |RHRS Angle | ||
+ | |48.892° | ||
+ | |- | ||
+ | |RHRS DAQ Config | ||
+ | |RHRSadaq2 | ||
+ | |- | ||
+ | |prescaleR | ||
+ | | PS1=PS2=PS3=1, && PS8=200 (all others zero) | ||
+ | |- | ||
+ | |} | ||
+ | |||
+ | <!-- | ||
+ | |||
- Calo_theta= 10.1(deg), Distance = 2.5m (from target)<br/> | - Calo_theta= 10.1(deg), Distance = 2.5m (from target)<br/> | ||
− | - LHRS=3.996 GeV/c (negative pol), angle=20.243(deg), Q1=1916.640 | + | - LHRS=3.996 GeV/c (negative pol), angle=20.243(deg), Q1=1916.640 (readout:1900)/1600/1600 (Q1 regul.OFF)<br> |
- RHRS=2.101 GeV/c (negative pol), angle=48.892(deg)<br> | - RHRS=2.101 GeV/c (negative pol), angle=48.892(deg)<br> | ||
- PreScaleR : PS1=PS2=PS3=1, && PS8=200<br> | - PreScaleR : PS1=PS2=PS3=1, && PS8=200<br> | ||
- PreScaleL : PS9 =1, + DVCS config.<br><br> | - PreScaleL : PS9 =1, + DVCS config.<br><br> | ||
- Raster : 2x2mm^2 | - Raster : 2x2mm^2 | ||
+ | |||
+ | --> |
Latest revision as of 11:01, 7 April 2016
Return to List of Daily Run Plans
Contents
Shift Status Notice
MCC is hopeful that CW beam could be delivered by mid-shift. shift is on stand-by
- TO must report to shift.
- Remaining crew must stay in the area.
- Notify RC of contact information.
- Be ready to return to shift on short notice.
Shift Duties When No Beam
- Monitor target (keep in HOME position)
- Respond to calls and alert RC as needed.
- Fill out shift checklist during this shift.
- If beam is close to returning, notify the RC.
If Beam Returns
- Perform Beam After Extended Downtime procedure from below
- Proceed with Production data taking.
Beam After Extended Downtime
This procedure is to be
- Harp Scans
- Move target to HOME position (if not already there) (mask target motion!)
- Turn VDC HV OFF for both arms.
- Turn DVCS Calo HV OFF
- Ask MCC for Raster OFF (check that it turns off in the scope)
- Ask MCC to perform Harp Scans (on IHA1H04A and IHA1H04B)
- Must have three peaks on each with a resolution of ~200-500 μm
- Have seen a "shoulder" on the last peak before. May be acceptable if other 2 peaks are fine.
- Ask MCC to make an ELOG with the results of the Harp Scans
- Beam Centering on Carbon Hole Target
- Move target to the Carbon Hole position (mask target motion!)
- Ensure Left-HRS momentum is ~1 GeV/c
- Set Left-HRS DAQ configuration to LeftHRSnew
- Set prescales as ps_i = 1 for i = 1-6, and ps=0 for all others
- Turn VDC HC OFF for both arms.
- Turn DVCS Calo HV OFF
- Ask MCC for Raster ON at 2x2
- Check that it turns on in the scope, and check Raster GUI to confirm 2x2 setting
- Ask MCC for 5 μA beam
- Run spot_L as explained in the detailed instructions
- If not centered ask MCC to move beam accordingly (check board for coordinates)
- Repeat test with different beam position until target is centered.
- Raster Target
- Start the same settings as carbon hole centering
- Move to Raster Target (mask target motion!)
- Ask MCC for 5uA beam with Raster ON (2x2)
- Check rates and confirm they are consistent with rates seen during HOME position
- If the rates are low and consistent, then move on to next step
- If the rates are high, it may indicate the beam has an angle that causes the beam to scrape on an edge of the target
- Notify the RC
- Ask MCC to readjust bpm positions until this angle is removed
- When done, perform another Carbon Hole run just to be sure.
Production Running
For the remainder of the shift take 1 hour runs in the production configuration DVCS: Kin_48_2
Beam current | 15 μA |
Target | LH2 |
Raster | ON (2x2mm2) |
VDC HV (both arms) | ON |
DVCS Calo HV | ON |
DVCS Calo Angle; | 15.185° |
DVCS Calo Distance | 2.0 m |
LHRS Polarity | Negative |
LHRS Momentum | 3.996 GeV/c |
LHRS Angle | 20.243° |
LHRS Q1 Current | 1916.640 (regulator OFF) |
LHRS DAQ Config | DVCS |
prescaleL | PS9=1 (all others zero) |
RHRS Polarity | Negative |
RHRS Momentum | 2.101 GeV/c |
RHRS Angle | 48.892° |
RHRS DAQ Config | RHRSadaq2 |
prescaleR | PS1=PS2=PS3=1, && PS8=200 (all others zero) |