+ | ====Shift Status Notice==== | ||
+ | MCC is hopeful that CW beam could be delivered by DAY shift. | ||
+ | * '''All''' shift crew should report to the counting house at the start of the SWING shift. | ||
+ | |||
+ | ====Shift Duties When No Beam==== | ||
+ | * Monitor target (keep in HOME position) | ||
+ | * Respond to calls and alert RC as needed. | ||
+ | * Fill out shift checklist during this shift. | ||
+ | * If beam is close to returning, '''notify''' the RC. | ||
+ | |||
+ | ====If Beam Returns==== | ||
+ | * Perform Beam After Extended Downtime procedure from below | ||
+ | <!-- * Perform extended ~20 minute Carbon Hole run (only '''once''') --> | ||
+ | * Proceed with Production data taking. | ||
+ | |||
+ | ====Beam After Extended Downtime==== | ||
+ | This procedure is to be | ||
+ | * Harp Scans | ||
+ | ** Move target to HOME position (if not already there) (mask target motion!) | ||
+ | ** Turn VDC HV '''OFF''' for both arms. | ||
+ | ** Turn DVCS Calo HV '''OFF''' | ||
+ | ** Ask MCC for Raster '''OFF''' (check that it turns off in the scope) | ||
+ | ** Ask MCC to perform Harp Scans (on IHA1H04A and IHA1H04B) | ||
+ | *** Must have three peaks on each with a resolution of ~200-500 μm | ||
+ | *** Have seen a "shoulder" on the last peak before. May be acceptable if other 2 peaks are fine. | ||
+ | ** Ask MCC to make an ELOG with the results of the Harp Scans | ||
+ | * Beam Centering on Carbon Hole Target | ||
+ | ** Move target to the Carbon Hole position (mask target motion!) | ||
+ | ** Ensure Left-HRS momentum is ~1 GeV/c | ||
+ | ** Set Left-HRS DAQ configuration to [https://hallaweb.jlab.org/wiki/index.php/How_to_HRS_/_DVCS#Changing_from_the_.22DVCS.22_run_type_to_the_.22LHRSnew.22_run_type LeftHRSnew] | ||
+ | *** Set prescales as ps_i = 1 for i = 1-6, and ps=0 for all others | ||
+ | ** Turn VDC HC '''OFF''' for both arms. | ||
+ | ** Turn DVCS Calo HV '''OFF''' | ||
+ | ** Ask MCC for Raster '''ON''' at 2x2 | ||
+ | *** Check that it turns '''on''' in the scope, and check Raster GUI to confirm 2x2 setting | ||
+ | ** Ask MCC for 5 μA beam | ||
+ | *** Run spot_L as explained in the [http://hallaweb.jlab.org/equipment/daq/spot.html detailed instructions] | ||
+ | *** If not centered ask MCC to move beam accordingly (check board for coordinates) | ||
+ | *** Repeat test with different beam position until target is centered. | ||
+ | * Raster Target | ||
+ | ** Start the same settings as carbon hole centering | ||
+ | ** Move to Raster Target (mask target motion!) | ||
+ | ** Ask MCC for 5uA beam with Raster ON (2x2) | ||
+ | ** Check rates and confirm they are consistent with rates seen during HOME position | ||
+ | *** If the rates are low and consistent, then move on to next step | ||
+ | *** If the rates are high, it may indicate the beam has an angle that causes the beam to scrape on an edge of the target | ||
+ | **** Notify the RC | ||
+ | **** Ask MCC to readjust bpm positions until this angle is removed | ||
+ | **** When done, perform another Carbon Hole run just to be sure. | ||
+ | |||
+ | <!-- | ||
+ | ====Extended Carbon Hole Run==== | ||
+ | This is to be performed only '''once''' and may be skipped if already performed in previous shift. | ||
+ | * Move target to Carbon Hole position (mask target motion!) | ||
+ | ** Ensure Left-HRS momentum is ~1 GeV/c | ||
+ | ** Set Left-HRS DAQ configuration to [https://hallaweb.jlab.org/wiki/index.php/How_to_HRS_/_DVCS#Changing_from_the_.22DVCS.22_run_type_to_the_.22LHRSnew.22_run_type LeftHRSnew] | ||
+ | *** Set prescales as ps_i = 1 for i = 1-6, and ps=0 for all others | ||
+ | ** Turn the Right-HRS VDC HV '''OFF''' | ||
+ | ** Turn the Left-HRS VDC HV '''ON''' | ||
+ | ** Turn DVCS Calo HC '''OFF''' | ||
+ | ** Ensure Raster '''ON''' at 2x2 | ||
+ | *** Check that it turns '''on''' in the scope, and check Raster GUI to confirm 2x2 setting | ||
+ | ** Ask MCC for 5 μA beam | ||
+ | ** Take ~20 minute run with this setting. | ||
+ | |||
+ | --> | ||
+ | |||
+ | ====Production Running==== | ||
+ | For the remainder of the shift take 1 hour runs in the production configuration '''DVCS: Kin_48_2''' | ||
+ | {| | ||
+ | |Beam current | ||
+ | |15 μA | ||
+ | |- | ||
+ | |Target | ||
+ | |LH2 | ||
+ | |- | ||
+ | |Raster | ||
+ | |ON (2x2mm<sup>2</sup>) | ||
+ | |- | ||
+ | |VDC HV (both arms) | ||
+ | |ON | ||
+ | |- | ||
+ | |DVCS Calo HV | ||
+ | |ON | ||
+ | |- | ||
+ | |DVCS Calo Angle; | ||
+ | |15.185° | ||
+ | |- | ||
+ | |DVCS Calo Distance | ||
+ | | 2.0 m | ||
+ | |- | ||
+ | |LHRS Polarity | ||
+ | |Negative | ||
+ | |- | ||
+ | |LHRS Momentum | ||
+ | |3.996 GeV/c | ||
+ | |- | ||
+ | |LHRS Angle | ||
+ | |20.243° | ||
+ | |- | ||
+ | |LHRS Q1 Current | ||
+ | |1916.640 (regulator '''OFF''') | ||
+ | |- | ||
+ | |LHRS DAQ Config | ||
+ | |DVCS | ||
+ | |- | ||
+ | |prescaleL | ||
+ | | PS9=1 (all others zero) | ||
+ | |- | ||
+ | |RHRS Polarity | ||
+ | |Negative | ||
+ | |- | ||
+ | |RHRS Momentum | ||
+ | |2.101 GeV/c | ||
+ | |- | ||
+ | |RHRS Angle | ||
+ | |48.892° | ||
+ | |- | ||
+ | |RHRS DAQ Config | ||
+ | |RHRSadaq2 | ||
+ | |- | ||
+ | |prescaleR | ||
+ | | PS1=PS2=PS3=1, && PS8=200 (all others zero) | ||
+ | |- | ||
+ | |} | ||
+ | |||
+ | <!-- | ||
+ | |||
+ | - Calo_theta= 10.1(deg), Distance = 2.5m (from target)<br/> | ||
+ | - LHRS=3.996 GeV/c (negative pol), angle=20.243(deg), Q1=1916.640 (readout:1900)/1600/1600 (Q1 regul.OFF)<br> | ||
+ | - RHRS=2.101 GeV/c (negative pol), angle=48.892(deg)<br> | ||
+ | - PreScaleR : PS1=PS2=PS3=1, && PS8=200<br> | ||
+ | - PreScaleL : PS9 =1, + DVCS config.<br><br> | ||
+ | - Raster : 2x2mm^2 | ||
+ | |||
+ | --> |
Latest revision as of 11:08, 7 April 2016
Return to List of Daily Run Plans
Contents
Shift Status Notice
MCC is hopeful that CW beam could be delivered by DAY shift.
- All shift crew should report to the counting house at the start of the SWING shift.
Shift Duties When No Beam
- Monitor target (keep in HOME position)
- Respond to calls and alert RC as needed.
- Fill out shift checklist during this shift.
- If beam is close to returning, notify the RC.
If Beam Returns
- Perform Beam After Extended Downtime procedure from below
- Proceed with Production data taking.
Beam After Extended Downtime
This procedure is to be
- Harp Scans
- Move target to HOME position (if not already there) (mask target motion!)
- Turn VDC HV OFF for both arms.
- Turn DVCS Calo HV OFF
- Ask MCC for Raster OFF (check that it turns off in the scope)
- Ask MCC to perform Harp Scans (on IHA1H04A and IHA1H04B)
- Must have three peaks on each with a resolution of ~200-500 μm
- Have seen a "shoulder" on the last peak before. May be acceptable if other 2 peaks are fine.
- Ask MCC to make an ELOG with the results of the Harp Scans
- Beam Centering on Carbon Hole Target
- Move target to the Carbon Hole position (mask target motion!)
- Ensure Left-HRS momentum is ~1 GeV/c
- Set Left-HRS DAQ configuration to LeftHRSnew
- Set prescales as ps_i = 1 for i = 1-6, and ps=0 for all others
- Turn VDC HC OFF for both arms.
- Turn DVCS Calo HV OFF
- Ask MCC for Raster ON at 2x2
- Check that it turns on in the scope, and check Raster GUI to confirm 2x2 setting
- Ask MCC for 5 μA beam
- Run spot_L as explained in the detailed instructions
- If not centered ask MCC to move beam accordingly (check board for coordinates)
- Repeat test with different beam position until target is centered.
- Raster Target
- Start the same settings as carbon hole centering
- Move to Raster Target (mask target motion!)
- Ask MCC for 5uA beam with Raster ON (2x2)
- Check rates and confirm they are consistent with rates seen during HOME position
- If the rates are low and consistent, then move on to next step
- If the rates are high, it may indicate the beam has an angle that causes the beam to scrape on an edge of the target
- Notify the RC
- Ask MCC to readjust bpm positions until this angle is removed
- When done, perform another Carbon Hole run just to be sure.
Production Running
For the remainder of the shift take 1 hour runs in the production configuration DVCS: Kin_48_2
Beam current | 15 μA |
Target | LH2 |
Raster | ON (2x2mm2) |
VDC HV (both arms) | ON |
DVCS Calo HV | ON |
DVCS Calo Angle; | 15.185° |
DVCS Calo Distance | 2.0 m |
LHRS Polarity | Negative |
LHRS Momentum | 3.996 GeV/c |
LHRS Angle | 20.243° |
LHRS Q1 Current | 1916.640 (regulator OFF) |
LHRS DAQ Config | DVCS |
prescaleL | PS9=1 (all others zero) |
RHRS Polarity | Negative |
RHRS Momentum | 2.101 GeV/c |
RHRS Angle | 48.892° |
RHRS DAQ Config | RHRSadaq2 |
prescaleR | PS1=PS2=PS3=1, && PS8=200 (all others zero) |