Difference between revisions of "Tuesday, June 21, 2016 12:00 noon EST"

From Hall A Wiki
Jump to: navigation, search
(New page: '''Agenda:''' * Mainz beam test results * Discussion about work package scope and costing (see attached spreadsheet and schematic) * Progress on detector specific simulations and next ste...)
 
 
Line 3: Line 3:
 
* Mainz beam test results
 
* Mainz beam test results
 
* Discussion about work package scope and costing (see attached spreadsheet and schematic)
 
* Discussion about work package scope and costing (see attached spreadsheet and schematic)
* Progress on detector specific simulations and next steps
+
* Progress on detector specific simulations and next steps [[Image:Detector Studies.pdf]]
  
 
'''Call-in Instructions:'''
 
'''Call-in Instructions:'''

Latest revision as of 10:49, 21 June 2016

Agenda:

  • Mainz beam test results
  • Discussion about work package scope and costing (see attached spreadsheet and schematic)
  • Progress on detector specific simulations and next steps File:Detector Studies.pdf

Call-in Instructions:

Bluejeans:

Phone number: 1-888-240-2560 Meeting ID: 2254687741#

https://bluejeans.com/2254687741