Difference between revisions of "Run Plan (DVCS3)"
From Hall A Wiki
(2 intermediate revisions by one other user not shown) | |||
Line 8: | Line 8: | ||
[[Fall 2016 optic plans]] | [[Fall 2016 optic plans]] | ||
− | [[Fall 2016 elastic | + | |
+ | [[Fall 2016 calorimeter calibration (elastic)]] | ||
<hr> | <hr> | ||
Line 14: | Line 15: | ||
<hr> | <hr> | ||
<hr> | <hr> | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− |
Latest revision as of 16:58, 2 November 2016
For the 12 GeV DVCS experiment, go to [DVCS3 wiki ].
For the Fall of 2016 (FY2017), we plan on taking the kinematics 36_2, 36_3 and as many of the 60_* ones as we can.
Fall 2016 calorimeter calibration (elastic)