Difference between revisions of "Fall 2016 calorimeter calibration (elastic)"

From Hall A Wiki
Jump to: navigation, search
 
(2 intermediate revisions by the same user not shown)
Line 1: Line 1:
Back to [[https://hallaweb.jlab.org/wiki/index.php/Run_Plan_DVCS3 Run Plan DVCS 3 ]]
+
Back to [[https://hallaweb.jlab.org/wiki/index.php/Run_Plan_%28DVCS3%29 Back to the DVCS3 run plan page]]
  
 
'''This is in progress (09-20-16 contact J. Roche)'''
 
'''This is in progress (09-20-16 contact J. Roche)'''
Line 13: Line 13:
 
beam energy= 6.4 GeV<br>
 
beam energy= 6.4 GeV<br>
  
We will take about '''2 hours''' beam with three calorimeter angles: 21.4, 22.7 and 24.0 deg.  
+
We will take about '''2 hours''' beam with each of the following three calorimeter angles: 21.4, 22.7 and 24.0 deg.  
  
  

Latest revision as of 14:18, 20 September 2016

Back to [Back to the DVCS3 run plan page]

This is in progress (09-20-16 contact J. Roche)

Need to remove the plastic shield.
Calorimeter-Target distance =6.0m
LH2 target, unrastered beam (which means beam current at less than 5 uA).
LHRS in positive polarity.
Open LHRS collimator
DAQ: DVCS config, trigger is S0+S2, autovalidation.
angleLHRS= 32.50 [deg]
momentum LHRS= 3.0 GeV
beam energy= 6.4 GeV

We will take about 2 hours beam with each of the following three calorimeter angles: 21.4, 22.7 and 24.0 deg.


The plot below shows calculation for the case where we would move the calorimeter and the LHRS for each kinematic point.

DVCS3 Fall 2016 elastic.jpg