Difference between revisions of "Wednesday, September 28, 2016 2:00pm EST"
From Hall A Wiki
(New page: Last meeting: Wednesday, September 14, 2016 2:00pm EST == Agenda == <br><br> * MAG Meeting planning * next meeting time <br><br> == Minutes == Attending: <br><br> Return to...) |
(→Minutes) |
||
Line 15: | Line 15: | ||
− | Attending: | + | Attending: Juliette, KK, Cameron, Ernie, Jason, Jim |
+ | * MAG meeting | ||
+ | ** sent out a Doodle poll, only responses are from George Clark and Jay Benesch | ||
+ | ** KK - overview | ||
+ | ** Juliette - spectrometer (segmented torus) | ||
+ | ** Rakitha - collimator design/ power deposited | ||
+ | ** MIT - vacuum box, conductor size, | ||
+ | ** look at presentations we made last time and update | ||
+ | ** prepare outlines, extremely rough drafts | ||
+ | * timeline and manpower | ||
+ | ** dates can float | ||
+ | ** first column needs adjusted | ||
+ | ** add "academic" numbers | ||
<br><br> Return to [[Teleconferences]] | <br><br> Return to [[Teleconferences]] | ||
<br> Return to [[MOLLER at 11 GeV E09-005]] | <br> Return to [[MOLLER at 11 GeV E09-005]] |
Latest revision as of 14:25, 28 September 2016
Last meeting: Wednesday, September 14, 2016 2:00pm EST
Agenda
- MAG Meeting planning
- next meeting time
Minutes
Attending: Juliette, KK, Cameron, Ernie, Jason, Jim
- MAG meeting
- sent out a Doodle poll, only responses are from George Clark and Jay Benesch
- KK - overview
- Juliette - spectrometer (segmented torus)
- Rakitha - collimator design/ power deposited
- MIT - vacuum box, conductor size,
- look at presentations we made last time and update
- prepare outlines, extremely rough drafts
- timeline and manpower
- dates can float
- first column needs adjusted
- add "academic" numbers
Return to Teleconferences
Return to MOLLER at 11 GeV E09-005