Difference between revisions of "SoLID Weekly : Monday, Feb.6, 2017 9:30am EDT"

From Hall A Wiki
Jump to: navigation, search
(Agenda)
(Link to new wiki)
 
(5 intermediate revisions by one other user not shown)
Line 1: Line 1:
 +
This page has been moved to [https://solid.jlab.org/wiki/index.php/Weekly_:_Monday,_Feb.6,_2017_9:30am_EDT https://solid.jlab.org/wiki/index.php/Weekly_:_Monday,_Feb.6,_2017_9:30am_EDT] in the new [https://solid.jlab.org/wiki SoLID Wiki].  Please do not edit this page.
 +
 
== Agenda ==
 
== Agenda ==
  
 
Present:<br/>
 
Present:<br/>
Paul, JP, Seamus, Ole, Chao, Ye, Zhihong, Zhiwen
+
Paul, JP, Seamus, Ole, Chao, Ye, Zhihong, Zhiwen, Nilange
  
 
== Minutes ==
 
== Minutes ==
 +
 +
*Summarized the review text in 5 pages plus appendix
 +
** Paul and JP will send Zhiwen their drafts
 +
*The dimensions of the designed sub-detectors need to be finalized in the Collaboration meeting on March 5-6
 +
** The regular Monday meeting in two weeks from now will discuss the starting point of increasing space of sub-detectors (few cm--20cm--44cm?)
 +
** The target position is fixed and the baffle system is not changed.

Latest revision as of 15:38, 7 December 2020

This page has been moved to https://solid.jlab.org/wiki/index.php/Weekly_:_Monday,_Feb.6,_2017_9:30am_EDT in the new SoLID Wiki. Please do not edit this page.

Agenda

Present:
Paul, JP, Seamus, Ole, Chao, Ye, Zhihong, Zhiwen, Nilange

Minutes

  • Summarized the review text in 5 pages plus appendix
    • Paul and JP will send Zhiwen their drafts
  • The dimensions of the designed sub-detectors need to be finalized in the Collaboration meeting on March 5-6
    • The regular Monday meeting in two weeks from now will discuss the starting point of increasing space of sub-detectors (few cm--20cm--44cm?)
    • The target position is fixed and the baffle system is not changed.