Difference between revisions of "SoLID Weekly : Monday, Feb.6, 2017 9:30am EDT"
From Hall A Wiki
(→Minutes) |
(Link to new wiki) |
||
(2 intermediate revisions by one other user not shown) | |||
Line 1: | Line 1: | ||
+ | This page has been moved to [https://solid.jlab.org/wiki/index.php/Weekly_:_Monday,_Feb.6,_2017_9:30am_EDT https://solid.jlab.org/wiki/index.php/Weekly_:_Monday,_Feb.6,_2017_9:30am_EDT] in the new [https://solid.jlab.org/wiki SoLID Wiki]. Please do not edit this page. | ||
+ | |||
== Agenda == | == Agenda == | ||
Line 7: | Line 9: | ||
*Summarized the review text in 5 pages plus appendix | *Summarized the review text in 5 pages plus appendix | ||
− | ** | + | ** Paul and JP will send Zhiwen their drafts |
− | *The dimensions of the designed sub detectors need to be finalized in the Collaboration meeting on March 5-6 | + | *The dimensions of the designed sub-detectors need to be finalized in the Collaboration meeting on March 5-6 |
** The regular Monday meeting in two weeks from now will discuss the starting point of increasing space of sub-detectors (few cm--20cm--44cm?) | ** The regular Monday meeting in two weeks from now will discuss the starting point of increasing space of sub-detectors (few cm--20cm--44cm?) | ||
+ | ** The target position is fixed and the baffle system is not changed. |
Latest revision as of 15:38, 7 December 2020
This page has been moved to https://solid.jlab.org/wiki/index.php/Weekly_:_Monday,_Feb.6,_2017_9:30am_EDT in the new SoLID Wiki. Please do not edit this page.
Agenda
Present:
Paul, JP, Seamus, Ole, Chao, Ye, Zhihong, Zhiwen, Nilange
Minutes
- Summarized the review text in 5 pages plus appendix
- Paul and JP will send Zhiwen their drafts
- The dimensions of the designed sub-detectors need to be finalized in the Collaboration meeting on March 5-6
- The regular Monday meeting in two weeks from now will discuss the starting point of increasing space of sub-detectors (few cm--20cm--44cm?)
- The target position is fixed and the baffle system is not changed.