− | * | + | * Task list/status |
+ | ** tolerance analysis | ||
+ | ** material irradiation | ||
+ | ** radiation loads | ||
+ | ** impact of environmental variations | ||
+ | ** floor loading | ||
+ | ** fringe field impact | ||
* Status of MIT/JLAB work | * Status of MIT/JLAB work | ||
+ | ** funding for new work | ||
+ | ** MIT/SBU spectrometer prototype fabrication status | ||
+ | *** a bulleted list of the objectives of prototype testing | ||
+ | *** a test plan and schedule for the above (so JLab folks should travel to observe some of the testing when appropriate) | ||
+ | ** a breakdown of the MIT request | ||
+ | *** coil tests | ||
+ | *** collimator/apparatus engineering | ||
+ | *** other activities | ||
* Next meeting | * Next meeting | ||
Line 13: | Line 27: | ||
== Minutes == | == Minutes == | ||
+ | |||
+ | * Task list/status | ||
+ | ** tolerance analysis (in progress at Manitoba) | ||
+ | ** material irradiation (Rakitha will provide info to Juliette and MIT) | ||
+ | ** radiation loads (Rakitha will provide info to Juliette and MIT) | ||
+ | ** impact of environmental variations (Juliette will initiate conversation) | ||
+ | ** floor loading (MIT should approach JLAB about doing this estimate) | ||
+ | ** fringe field impact (fully at Manitoba) | ||
+ | ** EB meeting this week | ||
+ | ** Collaboration meeting mid-month | ||
+ | * Status of MIT/JLAB work | ||
+ | ** funding for new work - request is in; they are considering it | ||
+ | ** MIT/SBU spectrometer prototype fabrication status | ||
+ | *** conductor arrived; tooling arrives within the week. Waiting for another drive. | ||
+ | *** beginning of December may be good for a visit for Juliette | ||
+ | *** a bulleted list of the objectives of prototype testing | ||
+ | *** a test plan and schedule for the above (so JLab folks should travel to observe some of the testing when appropriate) | ||
+ | *** Ernie should continue to be the point man with Everson-Tesla | ||
+ | ** a breakdown of the MIT request | ||
+ | *** coil tests | ||
+ | *** collimator/apparatus engineering | ||
+ | *** other activities | ||
+ | * other tasks | ||
+ | ** Cameron working on shielding stuff | ||
+ | ** how to move forward with collimation over next couple of months | ||
+ | *** inner photon collimator alignment | ||
+ | ** send Cameron the CAD drawings | ||
+ | |||
+ | * Next meeting in two weeks; maybe a new time | ||
+ | |||
<br><br> | <br><br> |
Latest revision as of 14:26, 4 October 2017
Last meeting: Wednesday May 24, 2017 2:00pm ET
Agenda
- Task list/status
- tolerance analysis
- material irradiation
- radiation loads
- impact of environmental variations
- floor loading
- fringe field impact
- Status of MIT/JLAB work
- funding for new work
- MIT/SBU spectrometer prototype fabrication status
- a bulleted list of the objectives of prototype testing
- a test plan and schedule for the above (so JLab folks should travel to observe some of the testing when appropriate)
- a breakdown of the MIT request
- coil tests
- collimator/apparatus engineering
- other activities
- Next meeting
Minutes
- Task list/status
- tolerance analysis (in progress at Manitoba)
- material irradiation (Rakitha will provide info to Juliette and MIT)
- radiation loads (Rakitha will provide info to Juliette and MIT)
- impact of environmental variations (Juliette will initiate conversation)
- floor loading (MIT should approach JLAB about doing this estimate)
- fringe field impact (fully at Manitoba)
- EB meeting this week
- Collaboration meeting mid-month
- Status of MIT/JLAB work
- funding for new work - request is in; they are considering it
- MIT/SBU spectrometer prototype fabrication status
- conductor arrived; tooling arrives within the week. Waiting for another drive.
- beginning of December may be good for a visit for Juliette
- a bulleted list of the objectives of prototype testing
- a test plan and schedule for the above (so JLab folks should travel to observe some of the testing when appropriate)
- Ernie should continue to be the point man with Everson-Tesla
- a breakdown of the MIT request
- coil tests
- collimator/apparatus engineering
- other activities
- other tasks
- Cameron working on shielding stuff
- how to move forward with collimation over next couple of months
- inner photon collimator alignment
- send Cameron the CAD drawings
- Next meeting in two weeks; maybe a new time