Attendance: Juliette, KK, Cameron, Ernie, Jim, Rakitha<br>
 
Attendance: Juliette, KK, Cameron, Ernie, Jim, Rakitha<br>
 
# Prototype coil
 
# Prototype coil
*
+
## water test plumbed incorrectly
 +
### run in series instead of parallel
 +
## shipping on winding device
 +
## B-stage - stuck together turn-to-turn when moved to vacuum chamber
 +
### rectangle with hole
 +
### radius on corners
 +
### fiberglass tape half-lapped
 +
### B-stage is pre-impregnated tape vs. just tape
 +
### w/ latter back-fill with epoxy
 +
### former does not make a monolithic structure
 +
### ground wrap after w/ fiberglass tape
 +
### B-stage can be made with rad-hard epoxy
 +
### would still need to make with vacuum impregnation to remove voids
 +
## JLAB job, admin by JLAB, technical expertise remains w/ collaboration
 +
## testing water flow at MIT-Bates
 
# Other priorities
 
# Other priorities
 +
## Radiation dose
 +
### using number from spec sheet
 +
### not sure if it is just neutrons or E&M
 +
### maximum dose limits are very high, but we're running for 30k hours
 +
### needs to still look at e- and gamma
 +
### more concerned with mechanical integrity than electrical shorts
 +
## Sensitivities
 +
## segmented coil study
 +
### Ernie has some ideas for this
 +
# Magnet Advisory Group Meeting soon
  
 
Return to [[Teleconferences]]<br>
 
Return to [[Teleconferences]]<br>
 
Return to [[MOLLER at 11 GeV E09-005]]
 
Return to [[MOLLER at 11 GeV E09-005]]

Latest revision as of 16:38, 31 January 2018

previous meeting << >> following meeting

Logistic information

 BlueJeans calling instructions:
 Toll-Free Number (U.S.&  Canada):  888-240-2560
 International toll number:         408-740-7256
 Bluejeans CODE:                    734 609 7559
 Bluejeans link: https://bluejeans.com/7346097559

Agenda

  1. Status reports

Minutes

Attendance: Juliette, KK, Cameron, Ernie, Jim, Rakitha

  1. Prototype coil
    1. water test plumbed incorrectly
      1. run in series instead of parallel
    2. shipping on winding device
    3. B-stage - stuck together turn-to-turn when moved to vacuum chamber
      1. rectangle with hole
      2. radius on corners
      3. fiberglass tape half-lapped
      4. B-stage is pre-impregnated tape vs. just tape
      5. w/ latter back-fill with epoxy
      6. former does not make a monolithic structure
      7. ground wrap after w/ fiberglass tape
      8. B-stage can be made with rad-hard epoxy
      9. would still need to make with vacuum impregnation to remove voids
    4. JLAB job, admin by JLAB, technical expertise remains w/ collaboration
    5. testing water flow at MIT-Bates
  2. Other priorities
    1. Radiation dose
      1. using number from spec sheet
      2. not sure if it is just neutrons or E&M
      3. maximum dose limits are very high, but we're running for 30k hours
      4. needs to still look at e- and gamma
      5. more concerned with mechanical integrity than electrical shorts
    2. Sensitivities
    3. segmented coil study
      1. Ernie has some ideas for this
  3. Magnet Advisory Group Meeting soon