Difference between revisions of "Wednesday, May 9, 2018 3:00pm ET"

From Hall A Wiki
Jump to: navigation, search
(Minutes)
(Minutes)
 
(One intermediate revision by the same user not shown)
Line 36: Line 36:
 
## prototype
 
## prototype
 
# New meeting time
 
# New meeting time
## Possibly meet at 2pm ET  
+
## Possibly meet at 2pm ET Wed
 +
## Tuesday morning at 10am ET starting on the 15th
 +
### Collimator status and prototype timeline/plan
 +
### on 29th, sensitivity studies and prototype results
  
 
Return to [[Teleconferences]]<br>
 
Return to [[Teleconferences]]<br>
 
Return to [[MOLLER at 11 GeV E09-005]]
 
Return to [[MOLLER at 11 GeV E09-005]]

Latest revision as of 15:37, 9 May 2018

previous meeting << >> following meeting

Logistic information

 BlueJeans calling instructions:
 Toll-Free Number (U.S.&  Canada):  888-240-2560
 International toll number:         408-740-7256
 Bluejeans CODE:                    734 609 7559
 Bluejeans link: https://bluejeans.com/7346097559

Agenda

  1. Status reports
    1. Simulations
      1. Collimator/shielding
      2. Sensitivity studies
    2. Prototype tests
  2. New meeting time?

Minutes

Attendance: Juliette, KK, Kent, Cameron, Jason, Sakib

  1. Status reports
    1. Simulations
      1. Collimator/shielding
        1. Cameron working on it; coordinating with Kent and Chandan
      2. Sensitivity studies
        1. Upstream Magnet: Taking too long on farm; going to use lower statistics runs
        2. Beamline sensitivity: coil dose, radial position at entrance to dump
        3. segmented magnet (issues: a lot of water connections, supports, alignment) (benefits: pressure drop, easier to make)
          1. try to break off pieces and see where things start to fall apart
    2. Prototype tests
      1. power supply needed from JLAB
      2. push forward with water flow tests
  2. Collaboration Meeting end of July, early August
    1. shielding
    2. sensitivity studies
    3. prototype
  3. New meeting time
    1. Possibly meet at 2pm ET Wed
    2. Tuesday morning at 10am ET starting on the 15th
      1. Collimator status and prototype timeline/plan
      2. on 29th, sensitivity studies and prototype results

Return to Teleconferences
Return to MOLLER at 11 GeV E09-005