Difference between revisions of "Dec 3, 2018"

From Hall A Wiki
Jump to: navigation, search
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
 
Back to [[Main_Page|Main Page]] >> [[Moller|Moller Page]] >> [[Moller_Meeting_Agendas|Moller Weekly Meeting Index]]  
 
Back to [[Main_Page|Main Page]] >> [[Moller|Moller Page]] >> [[Moller_Meeting_Agendas|Moller Weekly Meeting Index]]  
  
[[Nov_19%2C_2018|previous meeting]] <<  >> [[Dec_3%2C_2018|following meeting]]
+
[[Nov_19%2C_2018|previous meeting]] <<  >> [[Dec_17%2C_2018|following meeting]]
  
  
Line 35: Line 35:
  
 
Minutes:
 
Minutes:
 +
Simona
 +
Magnet moving to Hall perhaps tomorrow.
 +
Yves has a rough plan for determining misalignment of magnet. Plan involves taking data at +/-4T fields. Need 1 minute of data at several points. Requires 3.5 hours.
 +
Simona working on HV controls for polarimeter. 24 V power supply on rate required replacement. Replacement complete and HV controls works. PMT voltage ramp now works.
 +
No update on O-rings.
 +
 +
Bill
 +
New comparison of G3/G4 better with G4 lead included. Azz still 0.4% different.
 +
Eric will verify using ideal quad fields in G3/G4 Azz comparison.
 +
 +
Erik
 +
Quad maps show significant focusing difference at dipole exit/detector. Will investigate quantitative difference in Azz at PREX CREX solutions. Will also see difference in quads scans due to new TOSCA maps.
  
  
Line 40: Line 52:
  
 
Attendees:
 
Attendees:
 
+
Bill, Simona, Dave, Don, Jim, Erik, Kent, Sanghwa
  
 
Excused:
 
Excused:

Latest revision as of 10:50, 17 December 2018

Back to Main Page >> Moller Page >> Moller Weekly Meeting Index

previous meeting << >> following meeting


Moller DocDB Meeting

Original Moller Polarimeter Page

Moller ELog


Connection details:


Meeting URL https://bluejeans.com/149766532

Meeting ID 149 766 532

US toll free phone 1.888.240.2560

Dial in, type in the meeting ID and then press ##



Agenda

  1. Update on hardware and software -Simona M
  2. GEANT4 simulation update -Eric K
  3. GEANT3 simulation update -Bill H slides

Minutes: Simona Magnet moving to Hall perhaps tomorrow. Yves has a rough plan for determining misalignment of magnet. Plan involves taking data at +/-4T fields. Need 1 minute of data at several points. Requires 3.5 hours. Simona working on HV controls for polarimeter. 24 V power supply on rate required replacement. Replacement complete and HV controls works. PMT voltage ramp now works. No update on O-rings.

Bill New comparison of G3/G4 better with G4 lead included. Azz still 0.4% different. Eric will verify using ideal quad fields in G3/G4 Azz comparison.

Erik Quad maps show significant focusing difference at dipole exit/detector. Will investigate quantitative difference in Azz at PREX CREX solutions. Will also see difference in quads scans due to new TOSCA maps.



Attendees: Bill, Simona, Dave, Don, Jim, Erik, Kent, Sanghwa

Excused: