Line 28: Line 28:
 
==So Far==
 
==So Far==
  
* Total charge: ~19.5C 
+
* Total charge: ~19.6C
 +
 
 +
[[File:APEX_charge_Mar5.png|x450px]]
  
 
==Plan==
 
==Plan==
* When we have beam tonight, take optics data for RHRS.  
+
* It is anticipated that the optics data taking will be completed by 16:00.
:- W Wire (Vertical) target: V1, V2, and V3. 1M events for each.
+
 
:- Optics 1 and Optics 3 targets: 3M events for each.
+
* Afterward, ~16:00, escorted access is needed for the Tech expert to change the polarities for RHRS magnets and Septum correctors.
:- W Wire (Horizontal): two wires H2 and H3, 1M events for each.  
+
  
* Once we have RHRS optics done, get back to production running.  
+
* After polarity change for the right arm, we will ramp up the magnets to 1.0632 GeV configuration.
  
* When ramping RHRS magnets, take use the time and beam to take LRHS optics data, with and without Sci.  
+
* We will go back to production data taking with Tungsten 2.8% target.
  
 
==Slides/Links==
 
==Slides/Links==

Latest revision as of 15:45, 8 March 2019

Back to:

Main Page
Daily Run Meetings
halog

3:30PM Run Meeting, Counting house meeting room (200C)

RC: Jinlong Zhang

Status

Daily run meeting today at 15:30 at upstairs conference room of the counting house. To call in via bluejeans: https://bluejeans.com/256205934

Status:

  • We got beam back this morning.
  • Sieves for both arms are IN. SciFi for left arm is IN.
  • Now working on the planed optics data taking for RHRS.
  • SciFi + tungsten wire data from LHRS were collected as well. John is analyzing them.
  • Yesterday, the high voltage of RHRS VDC tripped. Alex fixed that.

So Far

  • Total charge: ~19.6C

APEX charge Mar5.png

Plan

  • It is anticipated that the optics data taking will be completed by 16:00.
  • Afterward, ~16:00, escorted access is needed for the Tech expert to change the polarities for RHRS magnets and Septum correctors.
  • After polarity change for the right arm, we will ramp up the magnets to 1.0632 GeV configuration.
  • We will go back to production data taking with Tungsten 2.8% target.

Slides/Links

MCC scheduling Whiteboard: http://accboard.acc.jlab.org/

APEX wiki page: https://hallaweb.jlab.org/wiki/index.php/APEX

Bluejeans connection information

To join the Meeting: https://bluejeans.com/256205934

To join via Room System: Video Conferencing System: bjn.vc -or-199.48.152.152 Meeting ID : 256205934

To join via phone : 1) Dial:

  +1.408.740.7256 (United States)
  +1.888.240.2560 (US Toll Free)
  +1.408.317.9253 (Alternate number)
  (see all numbers - http://bluejeans.com/numbers)

2) Enter Conference ID : 256205934

Slides/Links

MCC scheduling Whiteboard: http://accboard.acc.jlab.org/

APEX wiki page: https://hallaweb.jlab.org/wiki/index.php/APEX

Bluejeans connection information

To join the Meeting: https://bluejeans.com/256205934

To join via Room System: Video Conferencing System: bjn.vc -or-199.48.152.152 Meeting ID : 256205934

To join via phone : 1) Dial:

  +1.408.740.7256 (United States)
  +1.888.240.2560 (US Toll Free)
  +1.408.317.9253 (Alternate number)
  (see all numbers - http://bluejeans.com/numbers)

2) Enter Conference ID : 256205934