https://logbooks.jlab.org/entry/3665804 | https://logbooks.jlab.org/entry/3665804 | ||
+ | https://logbooks.jlab.org/entry/3666105 | ||
* Taking the production runs during the weekend (03/09 and 03/10). | * Taking the production runs during the weekend (03/09 and 03/10). | ||
Line 38: | Line 39: | ||
* During the Sunday day shift (3/10,10:43-4:30pm), we were working on "No control on LHRS NMR" issue(https://logbooks.jlab.org/entry/3665647 and https://logbooks.jlab.org/entry/3665658). Jack was able to check the issue by going down to the hall (https://logbooks.jlab.org/entry/3665788), and he ended up with a working plan on Monday. | * During the Sunday day shift (3/10,10:43-4:30pm), we were working on "No control on LHRS NMR" issue(https://logbooks.jlab.org/entry/3665647 and https://logbooks.jlab.org/entry/3665658). Jack was able to check the issue by going down to the hall (https://logbooks.jlab.org/entry/3665788), and he ended up with a working plan on Monday. | ||
− | * At 18:54, the target alarm was on (https://logbooks.jlab.org/entry/3665822 and https://logbooks.jlab.org/entry/3665823) and we couldn't read back the target temperature from the four temperature sensors. Target on Call was called, and the issue may need to power cycle the target computer. | + | * At 18:54, the target alarm was on (https://logbooks.jlab.org/entry/3665822 and https://logbooks.jlab.org/entry/3665823) and we couldn't read back the target temperature from the four temperature sensors. Target on Call was called, and the issue may need to power cycle the raspberry-pi target computer." If rebooting the raspberry-pi that controls the target |
+ | temperature sensors does not bring back their readings we can carry on with the experiment." ---from Silviu. [[https://hallaweb.jlab.org/wiki/images/8/80/TG_temperature_simulation.pdf]] | ||
The above 2 issues need a control access to the Hall, and we plan to have Jack/Ethan and Silviu to work on the issue on Monday 3pm. | The above 2 issues need a control access to the Hall, and we plan to have Jack/Ethan and Silviu to work on the issue on Monday 3pm. | ||
Line 45: | Line 47: | ||
*Collect the production run data with both working Right and Left HRS at 40uA. | *Collect the production run data with both working Right and Left HRS at 40uA. | ||
+ | |||
+ | * Insert sieve on the left arm, and do the optics run for HRS T1=T4=1, others keeps to 0, see the run plan[[https://hallaweb.jlab.org/wiki/images/8/8d/LHRS_optics.pdf]] | ||
*plans for the down time during production run. | *plans for the down time during production run. |
Latest revision as of 15:14, 11 March 2019
Back to:
3:30PM Run Meeting, Counting house meeting room (200C)
RC: Ye Tian
Daily run meeting today at 15:30 at upstairs conference room of the counting house. To call in via bluejeans: https://bluejeans.com/256205934
Contents
Status
Experiment:
No beam study and no RF recovery this week
https://logbooks.jlab.org/entry/3665804 https://logbooks.jlab.org/entry/3666105
- Taking the production runs during the weekend (03/09 and 03/10).
- Taking the SciFi data from run 4721~4724 (https://logbooks.jlab.org/entry/3665700 and https://logbooks.jlab.org/entry/3665708)
- The production (no LHRS NMR) with monitoring LHRS D-G field (-0.37910)(https://logbooks.jlab.org/entry/3666018) from run 4725-4728
- The production (no LHRS NMR and target alarm silent) with monitoring the from run 4729-4759
Hall:
1) escorted access by ARM and John to reset SciFi motion system
2) escorted access by Jack to reboot the LHRS IOC (https://logbooks.jlab.org/entry/3665788)
3) control access planed at 3:00 pm to install the new LHRS NMR IOC portserver/bad wire and Sieliu will restart the target computer. Meanwhile we insert sieve on the left arm to start optics runs after the access.
Issue
- During the Sunday day shift (3/10,10:43-4:30pm), we were working on "No control on LHRS NMR" issue(https://logbooks.jlab.org/entry/3665647 and https://logbooks.jlab.org/entry/3665658). Jack was able to check the issue by going down to the hall (https://logbooks.jlab.org/entry/3665788), and he ended up with a working plan on Monday.
- At 18:54, the target alarm was on (https://logbooks.jlab.org/entry/3665822 and https://logbooks.jlab.org/entry/3665823) and we couldn't read back the target temperature from the four temperature sensors. Target on Call was called, and the issue may need to power cycle the raspberry-pi target computer." If rebooting the raspberry-pi that controls the target
temperature sensors does not bring back their readings we can carry on with the experiment." ---from Silviu. [[1]]
The above 2 issues need a control access to the Hall, and we plan to have Jack/Ethan and Silviu to work on the issue on Monday 3pm.
Plan
- Collect the production run data with both working Right and Left HRS at 40uA.
- Insert sieve on the left arm, and do the optics run for HRS T1=T4=1, others keeps to 0, see the run plan[[2]]
- plans for the down time during production run.
- Left HRS magnet down, then take the right HRS optics run (positron)
- Right HRS magnet down, then take the left HRS optics run
Slides/Links
MCC scheduling Whiteboard: http://accboard.acc.jlab.org/
APEX wiki page: https://hallaweb.jlab.org/wiki/index.php/APEX
Bluejeans connection information
To join the Meeting: https://bluejeans.com/256205934
To join via Room System: Video Conferencing System: bjn.vc -or-199.48.152.152 Meeting ID : 256205934
To join via phone : 1) Dial:
+1.408.740.7256 (United States) +1.888.240.2560 (US Toll Free) +1.408.317.9253 (Alternate number) (see all numbers - http://bluejeans.com/numbers)
2) Enter Conference ID : 256205934
Slides/Links
MCC scheduling Whiteboard: http://accboard.acc.jlab.org/
APEX wiki page: https://hallaweb.jlab.org/wiki/index.php/APEX
Bluejeans connection information
To join the Meeting: https://bluejeans.com/256205934
To join via Room System: Video Conferencing System: bjn.vc -or-199.48.152.152 Meeting ID : 256205934
To join via phone : 1) Dial:
+1.408.740.7256 (United States) +1.888.240.2560 (US Toll Free) +1.408.317.9253 (Alternate number) (see all numbers - http://bluejeans.com/numbers)
2) Enter Conference ID : 256205934