(Created page with "Meeting time is 11:00 AM EST on Mondays. The Bluejeans link is: https://bluejeans.com/758541689 * Monday, November 11th, 2017 ** Zhiwen's studies of test summing board a...") |
(Link to new wiki) |
||
(28 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
− | + | This page has been moved to [https://solid.jlab.org/wiki/index.php/Meeting_solid_preRD_cher https://solid.jlab.org/wiki/index.php/Meeting_solid_preRD_cher] in the new [https://solid.jlab.org/wiki SoLID Wiki]. Please do not edit this page. | |
+ | = info = | ||
− | * | + | * entire TCD readout channel count table https://docs.google.com/spreadsheets/d/13URifVfeglIG4pA04JUWV7Ygb8fSg9Acx5bbL52leQ8 |
− | * | + | * DAQ and run info (give your redmine account to Alex for access) https://redmine.jlab.org/projects/telescope-cerenkov/wiki |
− | * | + | * MAPMT readout assembly https://hallaweb.jlab.org/12GeV/SoLID/download/cc_pro/mapmt_readout_assembly.pdf |
− | ** Some design pictures from Ed are below: | + | * benchtest wiki https://hallaweb.jlab.org/wiki/index.php/Solid_cherenkov_readout |
+ | |||
+ | = meeting = | ||
+ | |||
+ | '''Meeting time is 12:00 PM EST on Mondays. The Bluejeans link is: https://bluejeans.com/758541689''' | ||
+ | |||
+ | == Monday, January 27th, 2020 == | ||
+ | |||
+ | * Schedule update | ||
+ | ** Tentative installation schedule: Beginning of March. | ||
+ | |||
+ | * Engineering status | ||
+ | ** Ed and I will transport the tank to JLab on Thursday, we plan on being there in the early-mid afternoon. | ||
+ | [[Image:First Large Mirror Ellipse 01.jpg|none|thumb|'''Fig. 1: Elliptical mirror assembled'''|400px]] | ||
+ | [[Image:IMG 0764.JPG|none|thumb|'''Fig. 2: Cross-hairs for alignment'''|400px]] | ||
+ | [[Image:IMG crosshairs down.JPG|none|thumb|'''Fig. 3: Cross-hairs down tube'''|400px]] | ||
+ | [[Image:IMG 0766.JPG|none|thumb|'''Fig. 4: Assembled cradle and tank'''|400px]] | ||
+ | [[Image:IMG 0767.JPG|none|thumb|'''Fig. 4: Assembled cradle and tank , close up of MaPMT box'''|400px]] | ||
+ | |||
+ | ** Tank and cradle is mostly finished. | ||
+ | ** All BNC patch cables (150 8') are done, still need to finish ~30 SHV patch cables. | ||
+ | ** Stand updates | ||
+ | |||
+ | * PMT and LAPPD coating is finished. | ||
+ | |||
+ | * Electronics update? | ||
+ | ** Zhiwen tested the sum board, has ringing. | ||
+ | |||
+ | *DAQ status? | ||
+ | ** Computer for data storage? | ||
+ | ** Analyzer? | ||
+ | |||
+ | *Documentation | ||
+ | |||
+ | |||
+ | == Monday, January 13th, 2020 == | ||
+ | |||
+ | * Engineering status | ||
+ | ** Updates on Tank Construction | ||
+ | [[Image:Cradle 8020 A.jpg|none|thumb|'''Fig. 1: 80/20 cradle progress'''|400px]] | ||
+ | |||
+ | [[Image:Cradle 8020 B.jpg|none|thumb|'''Fig. 2: 80/20 cradle progress 2'''|400px]] | ||
+ | |||
+ | [[Image:LAPPD Box.jpg|none|thumb|'''Fig. 3: LAPPD box tests'''|400px]] | ||
+ | |||
+ | [[Image:MaPMT Box.jpg|none|thumb|'''Fig. 4: MaPMT box'''|400px]] | ||
+ | |||
+ | |||
+ | ** Updates on Stand Construction | ||
+ | |||
+ | * Cabling update: | ||
+ | ** About 100 8' BNC patch cables are done, still need to make 40-50 BNC and all the SHV: | ||
+ | ** Do we need additional SHV patch for all scintillators and calorimeter PMTs. I have enough ends to make ~30 cables, but that will cover the MaPMTs + a few extras. I will need to order more SHV connectors if the lab doesn't have enough cables. | ||
+ | ** Lemo cables? (DAQ side) | ||
+ | |||
+ | * Mirrors update: | ||
+ | ** We have everything, just need to assemble | ||
+ | |||
+ | * Electronics board update: | ||
+ | ** Have everything, sending the boards and 160 MCX connectors and PMT pin bases to JLab on Wednesday morning. | ||
+ | *** I need to find out how long it will take to have a board assembled. | ||
+ | *** Just ordered the LV cable (and connectors) needed to run up to 50'. | ||
+ | |||
+ | * Tank delivery | ||
+ | ** Still Monday the 20th? | ||
+ | *** A1 is running well now! d2 change over "unofficially" delayed by 2 weeks. | ||
+ | *** Electronics board and LV cable are the holding issues. | ||
+ | |||
+ | *DAQ | ||
+ | ** Are we ready to set up a cosmics DAQ | ||
+ | ** Computer purchase? | ||
+ | ** Analyzer programing? | ||
+ | |||
+ | * Documentation for device | ||
+ | ** Safety documentation for JLab | ||
+ | ** Alignment, calibration, and commissioning procedures. | ||
+ | *** Lasers to align to beam-line. | ||
+ | ** Heavy gas fill procedure | ||
+ | *** Environmental/safety issues with heavy gas purge? | ||
+ | ** Run Plan | ||
+ | *** Tentative order: | ||
+ | **** Low rate / large angle with N2 and summing board | ||
+ | ***** Access will be for install, will need to repressurize. | ||
+ | **** Low rate / large angle with N2 and LAPPD | ||
+ | ***** Access will be opportunistic, will need to repressurize. | ||
+ | **** High rate / small angle with N2 and LAPPD | ||
+ | ***** Access needed to switch to small angle. | ||
+ | **** High rate /small angle with N2 and summing board | ||
+ | ***** Access will be opportunistic, will need to repressurize. | ||
+ | **** High rate /small angle with Heavy Gas and summing board | ||
+ | ***** Access will be opportunistic, will need to flush and fill with heavy gas. | ||
+ | **** High rate /small angle with Heavy Gas and MAROC | ||
+ | ***** Access will be opportunistic, will need to refill with heavy gas. | ||
+ | ** Kinematics switch timeline/plan | ||
+ | |||
+ | |||
+ | == Monday, January 6th, 2020 == | ||
+ | |||
+ | * Any A1/d2n scheduling updates? | ||
+ | |||
+ | * Engineering status | ||
+ | ** Updates on Tank Construction | ||
+ | *** New cradle design with 80/20: [[Image:8020 Cradle 05.jpeg|none|thumb|'''Fig. 1: 80/20 cradle design'''|400px]] | ||
+ | *** LAPPD box has leaky BNC feed throughs. Not sure about MaPMT box. | ||
+ | ** Updates on Stand Construction | ||
+ | |||
+ | * Outstanding items that need to be ordered/built/procured | ||
+ | ** Status of current orders: | ||
+ | *** MaPMTs (Ordered via ANL) | ||
+ | *** Mirrors (ECI film shipped, expected today/tomorrow) | ||
+ | **** Still need to do mirror assembly, i.e. attach film to carbon fiber blank. We have lexan film with no reflective coating to test. | ||
+ | *** Electronic summing board board (Ordered, board is printed and currently in component assembly) | ||
+ | **** Also will need to have MCX connectors attached (done at JLab, if Jack hasn't disowned us) | ||
+ | *** Gas regulation system (In hand, being assembled) | ||
+ | *** Cabling between prototype and patch-panel | ||
+ | **** Cabling (Components are in hand and set up to make 150 8' BNC patch cables and ~30 patch SHV, construction this week) | ||
+ | **** Do we have the additional SHV cables at the Lab? | ||
+ | *** Cabling between patch-panel and DAQ | ||
+ | **** Do we have the necessary BNC and SHV? Can we find the lemo cables? (Who to ask, Alex?) | ||
+ | |||
+ | * Tank delivery estimate? | ||
+ | ** Assuming 2-weeks from today (Jan 20th). If we are ready sooner, we will deliver ASAP. | ||
+ | *** I'll likely be delivering the tank to JLab alone, so I will need some help loading and unloading the van. | ||
+ | |||
+ | * Preparation of Cosmics test. | ||
+ | ** Space at the lab? | ||
+ | ** Electronics and cables ready? | ||
+ | ** Schedule for bench testing calorimeter blocks and scintillators. | ||
+ | |||
+ | * Documentation for device | ||
+ | ** Safety documentation for JLab | ||
+ | ** Alignment, calibration, and commissioning procedures. | ||
+ | *** Lasers to align to beam-line. | ||
+ | ** Heavy gas fill procedure | ||
+ | ** Run Plan | ||
+ | ** Kinematics switch timeline/plan | ||
+ | |||
+ | == Monday, December 16th, 2019 == | ||
+ | |||
+ | * Engineering status | ||
+ | ** Updates on Tank Construction | ||
+ | ** Updates on Stand Construction | ||
+ | |||
+ | * Outstanding items that need to be ordered/built/procured | ||
+ | ** Status of current orders: | ||
+ | *** MaPMTs (Need ordering institution) | ||
+ | *** Mirrors (ECI film ordered) | ||
+ | *** Electronic summing board board (Final quote determined, 2-week lead time) | ||
+ | *** Gas regulation system (ordered, still needs to be assembled) | ||
+ | **** What extra care do we need for gas tank, plumbing from tank on the floor to tank on table should bbe straight forward. | ||
+ | *** Cabling before patch-panel | ||
+ | **** What patch cables do we need? 134 BNC patch cables? Can we use cables from the previous prototype? How about SHV? Do we need 70 SHV patch cables also? | ||
+ | *** Cabling after patch-panel | ||
+ | **** Do we have the necessary BNC and SHV? Can we find the lemo cables? (Jian-Ping seems to think we can find the lemo cables at JLab) | ||
+ | |||
+ | * Preparation of Cosmics test. | ||
+ | ** Space at the lab? | ||
+ | ** Electronics and cables ready? | ||
+ | ** Schedule for bench testing calorimeter blocks and scintillators. | ||
+ | |||
+ | * MaPMT pixel test with wavelength shifter coating | ||
+ | |||
+ | * Documentation for device | ||
+ | ** Status of SOW's for Argonne | ||
+ | ** Safety documentation for JLab | ||
+ | ** Alignment, calibration, and commissioning procedures. | ||
+ | *** Lasers to align to beam-line. | ||
+ | ** Heavy gas fill procedure | ||
+ | ** Run Plan | ||
+ | ** Kinematics switch timeline/plan | ||
+ | |||
+ | == Monday, December 9th, 2019 == | ||
+ | |||
+ | List of topics for meeting today: | ||
+ | |||
+ | * Engineering status | ||
+ | ** Updates on Tank Construction | ||
+ | *** Is there adequate space in the current design for the scintillator arrays? [[Image of Design]] | ||
+ | ** Updates on Stand Construction | ||
+ | |||
+ | * Outstanding items that need to be ordered/built/procured | ||
+ | ** Status of current orders: | ||
+ | *** MaPMTs | ||
+ | *** Mirrors | ||
+ | *** Electronic summing board board | ||
+ | **** Use MCX connectors with MCX to BNC conversion cables? $2400 total cost on entire MCX to BNC out, saves time on assembly/labor. | ||
+ | *** MAROC electronics | ||
+ | *** Gas regulation system | ||
+ | ** Status of lead block availability at JLab? | ||
+ | ** Status of lemo cable availability at JLab? | ||
+ | ** Status of BNC cable availability at JLab? | ||
+ | ** Status of SHV cable availability at JLab? | ||
+ | |||
+ | * Preparation of Cosmics test. | ||
+ | ** Space at the lab? | ||
+ | ** Electronics and cables ready? | ||
+ | ** Schedule for bench testing calorimeter blocks and scintillators. | ||
+ | |||
+ | * MaPMT pixel test with wavelength shifter coating | ||
+ | |||
+ | * Documentation for device | ||
+ | ** Status of SOW's for Argonne | ||
+ | ** Safety documentation for JLab | ||
+ | ** Alignment, calibration, and commissioning procedures. | ||
+ | ** Heavy gas fill procedure | ||
+ | ** Run Plan | ||
+ | ** Kinematics switch timeline/plan | ||
+ | |||
+ | == Monday, November 11th, 2017 == | ||
+ | |||
+ | * Mark's pictures of the target from various spots in the hall [[File:Marks_pictures_of_target.pdf]] | ||
+ | |||
+ | * Some design pictures from Ed are below: | ||
+ | |||
+ | [[Image:Bazooka_14.jpg|none|thumb|'''Fig. 1: Initial work on Prototype Tank'''|600px]] | ||
+ | |||
+ | [[Image:16_Inch_Blank_Flange_10.jpeg|thumb|'''Fig. 2: Schematic of blank circular flange'''|600px]] | ||
+ | |||
+ | [[Image:Cerenkov_14_Inch_PVC_05.jpeg|none|thumb|'''Fig. 3: Design for tank housing, with flange attachment possibilities'''|600px]] | ||
+ | |||
+ | [[Image:16_Inch_Flange_BNC_SHV.jpeg|none|thumb|'''Fig. 4: Schematic of circular flange with 80 BNC and 16 SVH feedthroughs''|600px]] | ||
+ | |||
+ | [[Image:Square_Flange_MaPMT_Sketch_View.jpeg|none|thumb|'''Fig. 5: Schematic of square flange option'''|600px]] | ||
+ | |||
+ | [[Image:20_Square_MaPMT.jpeg|none|thumb|'''Fig. 6: Image of square flange option'''|600px]] | ||
+ | |||
+ | [[Image:20_Square_MaPMT_10.jpeg|none|thumb|'''Fig. 7: Alternate view image of square flange option'''|600px]] |
Latest revision as of 15:38, 7 December 2020
This page has been moved to https://solid.jlab.org/wiki/index.php/Meeting_solid_preRD_cher in the new SoLID Wiki. Please do not edit this page.
Contents
info
- entire TCD readout channel count table https://docs.google.com/spreadsheets/d/13URifVfeglIG4pA04JUWV7Ygb8fSg9Acx5bbL52leQ8
- DAQ and run info (give your redmine account to Alex for access) https://redmine.jlab.org/projects/telescope-cerenkov/wiki
- MAPMT readout assembly https://hallaweb.jlab.org/12GeV/SoLID/download/cc_pro/mapmt_readout_assembly.pdf
meeting
Meeting time is 12:00 PM EST on Mondays. The Bluejeans link is: https://bluejeans.com/758541689
Monday, January 27th, 2020
- Schedule update
- Tentative installation schedule: Beginning of March.
- Engineering status
- Ed and I will transport the tank to JLab on Thursday, we plan on being there in the early-mid afternoon.
- Tank and cradle is mostly finished.
- All BNC patch cables (150 8') are done, still need to finish ~30 SHV patch cables.
- Stand updates
- PMT and LAPPD coating is finished.
- Electronics update?
- Zhiwen tested the sum board, has ringing.
- DAQ status?
- Computer for data storage?
- Analyzer?
- Documentation
Monday, January 13th, 2020
- Engineering status
- Updates on Tank Construction
- Updates on Stand Construction
- Cabling update:
- About 100 8' BNC patch cables are done, still need to make 40-50 BNC and all the SHV:
- Do we need additional SHV patch for all scintillators and calorimeter PMTs. I have enough ends to make ~30 cables, but that will cover the MaPMTs + a few extras. I will need to order more SHV connectors if the lab doesn't have enough cables.
- Lemo cables? (DAQ side)
- Mirrors update:
- We have everything, just need to assemble
- Electronics board update:
- Have everything, sending the boards and 160 MCX connectors and PMT pin bases to JLab on Wednesday morning.
- I need to find out how long it will take to have a board assembled.
- Just ordered the LV cable (and connectors) needed to run up to 50'.
- Have everything, sending the boards and 160 MCX connectors and PMT pin bases to JLab on Wednesday morning.
- Tank delivery
- Still Monday the 20th?
- A1 is running well now! d2 change over "unofficially" delayed by 2 weeks.
- Electronics board and LV cable are the holding issues.
- Still Monday the 20th?
- DAQ
- Are we ready to set up a cosmics DAQ
- Computer purchase?
- Analyzer programing?
- Documentation for device
- Safety documentation for JLab
- Alignment, calibration, and commissioning procedures.
- Lasers to align to beam-line.
- Heavy gas fill procedure
- Environmental/safety issues with heavy gas purge?
- Run Plan
- Tentative order:
- Low rate / large angle with N2 and summing board
- Access will be for install, will need to repressurize.
- Low rate / large angle with N2 and LAPPD
- Access will be opportunistic, will need to repressurize.
- High rate / small angle with N2 and LAPPD
- Access needed to switch to small angle.
- High rate /small angle with N2 and summing board
- Access will be opportunistic, will need to repressurize.
- High rate /small angle with Heavy Gas and summing board
- Access will be opportunistic, will need to flush and fill with heavy gas.
- High rate /small angle with Heavy Gas and MAROC
- Access will be opportunistic, will need to refill with heavy gas.
- Low rate / large angle with N2 and summing board
- Tentative order:
- Kinematics switch timeline/plan
Monday, January 6th, 2020
- Any A1/d2n scheduling updates?
- Engineering status
- Updates on Tank Construction
- New cradle design with 80/20:
- LAPPD box has leaky BNC feed throughs. Not sure about MaPMT box.
- Updates on Stand Construction
- Updates on Tank Construction
- Outstanding items that need to be ordered/built/procured
- Status of current orders:
- MaPMTs (Ordered via ANL)
- Mirrors (ECI film shipped, expected today/tomorrow)
- Still need to do mirror assembly, i.e. attach film to carbon fiber blank. We have lexan film with no reflective coating to test.
- Electronic summing board board (Ordered, board is printed and currently in component assembly)
- Also will need to have MCX connectors attached (done at JLab, if Jack hasn't disowned us)
- Gas regulation system (In hand, being assembled)
- Cabling between prototype and patch-panel
- Cabling (Components are in hand and set up to make 150 8' BNC patch cables and ~30 patch SHV, construction this week)
- Do we have the additional SHV cables at the Lab?
- Cabling between patch-panel and DAQ
- Do we have the necessary BNC and SHV? Can we find the lemo cables? (Who to ask, Alex?)
- Status of current orders:
- Tank delivery estimate?
- Assuming 2-weeks from today (Jan 20th). If we are ready sooner, we will deliver ASAP.
- I'll likely be delivering the tank to JLab alone, so I will need some help loading and unloading the van.
- Assuming 2-weeks from today (Jan 20th). If we are ready sooner, we will deliver ASAP.
- Preparation of Cosmics test.
- Space at the lab?
- Electronics and cables ready?
- Schedule for bench testing calorimeter blocks and scintillators.
- Documentation for device
- Safety documentation for JLab
- Alignment, calibration, and commissioning procedures.
- Lasers to align to beam-line.
- Heavy gas fill procedure
- Run Plan
- Kinematics switch timeline/plan
Monday, December 16th, 2019
- Engineering status
- Updates on Tank Construction
- Updates on Stand Construction
- Outstanding items that need to be ordered/built/procured
- Status of current orders:
- MaPMTs (Need ordering institution)
- Mirrors (ECI film ordered)
- Electronic summing board board (Final quote determined, 2-week lead time)
- Gas regulation system (ordered, still needs to be assembled)
- What extra care do we need for gas tank, plumbing from tank on the floor to tank on table should bbe straight forward.
- Cabling before patch-panel
- What patch cables do we need? 134 BNC patch cables? Can we use cables from the previous prototype? How about SHV? Do we need 70 SHV patch cables also?
- Cabling after patch-panel
- Do we have the necessary BNC and SHV? Can we find the lemo cables? (Jian-Ping seems to think we can find the lemo cables at JLab)
- Status of current orders:
- Preparation of Cosmics test.
- Space at the lab?
- Electronics and cables ready?
- Schedule for bench testing calorimeter blocks and scintillators.
- MaPMT pixel test with wavelength shifter coating
- Documentation for device
- Status of SOW's for Argonne
- Safety documentation for JLab
- Alignment, calibration, and commissioning procedures.
- Lasers to align to beam-line.
- Heavy gas fill procedure
- Run Plan
- Kinematics switch timeline/plan
Monday, December 9th, 2019
List of topics for meeting today:
- Engineering status
- Updates on Tank Construction
- Is there adequate space in the current design for the scintillator arrays? Image of Design
- Updates on Stand Construction
- Updates on Tank Construction
- Outstanding items that need to be ordered/built/procured
- Status of current orders:
- MaPMTs
- Mirrors
- Electronic summing board board
- Use MCX connectors with MCX to BNC conversion cables? $2400 total cost on entire MCX to BNC out, saves time on assembly/labor.
- MAROC electronics
- Gas regulation system
- Status of lead block availability at JLab?
- Status of lemo cable availability at JLab?
- Status of BNC cable availability at JLab?
- Status of SHV cable availability at JLab?
- Status of current orders:
- Preparation of Cosmics test.
- Space at the lab?
- Electronics and cables ready?
- Schedule for bench testing calorimeter blocks and scintillators.
- MaPMT pixel test with wavelength shifter coating
- Documentation for device
- Status of SOW's for Argonne
- Safety documentation for JLab
- Alignment, calibration, and commissioning procedures.
- Heavy gas fill procedure
- Run Plan
- Kinematics switch timeline/plan
Monday, November 11th, 2017
- Mark's pictures of the target from various spots in the hall File:Marks pictures of target.pdf
- Some design pictures from Ed are below: