Difference between revisions of "Subsystem progress tracking, 2020"

From Hall A Wiki
Jump to: navigation, search
(GMN Run plan document)
 
(8 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
=GMN Run plan document=
 
=GMN Run plan document=
* January 6 version[[File:GMN_plan_Jan6.pdf]]
+
* January 6 version [https://hallaweb.jlab.org/wiki/images/c/c1/GMN_plan_Jan6.pdf PDF]
  
=Software=
+
The association of contact people with detectors is from the draft run plan document
* December 15, 2019 assessment
+
  
=Infrastructure=
+
The goal of this page is to collect a 1-2 page "living" assessment document, to be updated approximately ~monthly, that addresses the following items for each subsystem:
 +
* Assessment of progress over the last six months or since previous collaboration meeting
 +
* Milestones/tasks toward readiness for beam.
 +
* Estimated timeline for completion of said milestones/tasks.
 +
* Any other issues: assessment of manpower/anticipated need for JLab resources/etc.
 +
 
 +
The preferred method of collecting the documents is for the contact people to upload your document(s) to the SBS private DocDB ([https://sbs.jlab.org/cgi-bin/DocDB/private/DocumentDatabase link]), which requires your JLab CUE credentials, and then link to your DocDB entry at this wiki page.
 +
 
 +
=Beamline=
 +
Contact person: Silviu Covrig (upstream anyway)
 +
 
 +
=Target=
 +
Contact person: Dave Meekins
 +
 
 +
=Moller Polarimeter=
 +
Contact person: Simona Malace
 +
 
 +
=Left HRS=
 +
Contact Person: Bob Michaels
 +
 
 +
==Left HRS detector reinstallation==
 +
Contact person: Jack Segal
 +
 
 +
=HV controls for SBS detectors=
 +
Contact person: Bob Michaels
 +
 
 +
=SBS equipment installation=
 +
Contact person: Jessie Butler
 +
 
 +
=DAQ electronics and software=
 +
Contact person: Alex Camsonne
 +
 
 +
=Simulations and Data Analysis Software=
 +
Contact Person: Andrew Puckett
 +
* '''December 15, 2019 assessment [https://sbs.jlab.org/DocDB/0000/000044/001/SoftwareProgressTracking.pdf PDF]'''
 +
 
 +
=DC power for spectrometer magnets=
 +
Contact: Jack Segal
 +
 
 +
=GEM chamber gas supply system=
 +
Contact: Jack. Segal
 +
 
 +
=HCAL=
 +
Contact: Brian Quinn
 +
 
 +
=BigBite DAQ and analysis=
 +
Contact: Mark Jones
 +
 
 +
=BigBite Shower/PreShower=
 +
Contact: Arun Tadepalli
 +
 
 +
=BigBite Timing Hodoscope=
 +
Contact: Rachel Montgomery
 +
 
 +
=GRINCH=
 +
Contact: Todd Averett
 +
 
 +
=BigBite GEMs=
 +
Contact: Nilanga Liyanage
 +
 
 +
=GEN-RP detectors=
 +
Contact: Brad Sawatzky

Latest revision as of 12:52, 10 February 2020

GMN Run plan document

  • January 6 version PDF

The association of contact people with detectors is from the draft run plan document

The goal of this page is to collect a 1-2 page "living" assessment document, to be updated approximately ~monthly, that addresses the following items for each subsystem:

  • Assessment of progress over the last six months or since previous collaboration meeting
  • Milestones/tasks toward readiness for beam.
  • Estimated timeline for completion of said milestones/tasks.
  • Any other issues: assessment of manpower/anticipated need for JLab resources/etc.

The preferred method of collecting the documents is for the contact people to upload your document(s) to the SBS private DocDB (link), which requires your JLab CUE credentials, and then link to your DocDB entry at this wiki page.

Beamline

Contact person: Silviu Covrig (upstream anyway)

Target

Contact person: Dave Meekins

Moller Polarimeter

Contact person: Simona Malace

Left HRS

Contact Person: Bob Michaels

Left HRS detector reinstallation

Contact person: Jack Segal

HV controls for SBS detectors

Contact person: Bob Michaels

SBS equipment installation

Contact person: Jessie Butler

DAQ electronics and software

Contact person: Alex Camsonne

Simulations and Data Analysis Software

Contact Person: Andrew Puckett

  • December 15, 2019 assessment PDF

DC power for spectrometer magnets

Contact: Jack Segal

GEM chamber gas supply system

Contact: Jack. Segal

HCAL

Contact: Brian Quinn

BigBite DAQ and analysis

Contact: Mark Jones

BigBite Shower/PreShower

Contact: Arun Tadepalli

BigBite Timing Hodoscope

Contact: Rachel Montgomery

GRINCH

Contact: Todd Averett

BigBite GEMs

Contact: Nilanga Liyanage

GEN-RP detectors

Contact: Brad Sawatzky