Difference between revisions of "Target Field and Kepco Power Supplies"

From Hall A Wiki
Jump to: navigation, search
(Created page with "*Log Entries")
 
(Plan for returning from CODIV shutdown)
 
(5 intermediate revisions by the same user not shown)
Line 1: Line 1:
*Log Entries
+
This page is dedicated to all things Target Field related
 +
 
 +
==Log Entries==
 +
** Nov. 26th Kepcos replaced Agilents  https://logbooks.jlab.org/entry/3744320
 +
** Dec. 26th V_in vs Current Calibration for two Kepcos in voltage control mode https://logbooks.jlab.org/entry/3747508
 +
** Jan. 4th Swapped out Kepco with another Kepco because it was not stable https://logbooks.jlab.org/entry/3758511
 +
** Jan. 15th Swapped out Kepco with another Kepco because it was running hot and tripping https://logbooks.jlab.org/entry/3764365
 +
** Feb. 9th Field sweep program updated for Agilent https://logbooks.jlab.org/entry/3780264
 +
** Feb. 10th Replaced Kepco with Agilent.  Rearranged rack for better cooling https://logbooks.jlab.org/entry/3781492
 +
** Feb. 14th Replaced Agilent with new Kepco.  In constant current mode the inductive load option interfered with NMR https://logbooks.jlab.org/entry/3783977
 +
** March 18th In constant voltage mode, coils need time to warm up https://logbooks.jlab.org/entry/3805990
 +
** March 22nd New kepco had odd behavior in voltage mode.  Transverse NMR was not working.  Left in current mode. https://logbooks.jlab.org/entry/3807357
 +
** March 22nd Odd behavior explained from above.  Noticed possible grounding issues.  https://logbooks.jlab.org/entry/3807894
 +
** March 24th Trouble getting transverse NMR signal.  Bad Cable?  https://logbooks.jlab.org/entry/3809148
 +
 
 +
==Coil Currents for D2n==
 +
 
 +
==Labview Program Guide==
 +
 
 +
==Field Measurements==
 +
 
 +
==Plan for returning from CODIV shutdown==
 +
** Follow manufactureres "Check out" procedure for new power supply which was delivered during shutdown
 +
** Measure resistance to ground for both coils
 +
** Install latest new power supply, add additional circuitry
 +
** Test power supplies in both current and voltage control mode
 +
** Look at PS output on scope, with and without RF on.
 +
** Test NMR in both voltage and current mode
 +
** Ensure Labview is ready to go for either configuration

Latest revision as of 10:34, 1 June 2020

This page is dedicated to all things Target Field related

Log Entries

Coil Currents for D2n

Labview Program Guide

Field Measurements

Plan for returning from CODIV shutdown

    • Follow manufactureres "Check out" procedure for new power supply which was delivered during shutdown
    • Measure resistance to ground for both coils
    • Install latest new power supply, add additional circuitry
    • Test power supplies in both current and voltage control mode
    • Look at PS output on scope, with and without RF on.
    • Test NMR in both voltage and current mode
    • Ensure Labview is ready to go for either configuration