Difference between revisions of "Feb 8, 2021"

From Hall A Wiki
Jump to: navigation, search
(Created page with "Back to Main Page >> Moller Page >> Moller Weekly Meeting Index previous meeting << >> Feb_22%2C_2...")
 
 
(3 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
Back to [[Main_Page|Main Page]] >> [[Moller|Moller Page]] >> [[Moller_Meeting_Agendas|Moller Weekly Meeting Index]]  
 
Back to [[Main_Page|Main Page]] >> [[Moller|Moller Page]] >> [[Moller_Meeting_Agendas|Moller Weekly Meeting Index]]  
  
[[Feb_15%2C_2021|previous meeting]] <<  >> [[Feb_22%2C_2021|following meeting]]
+
[[Jan_11%2C_2021|previous meeting]] <<  >> [[Feb_15%2C_2021|following meeting]]
  
  
Line 15: Line 15:
 
Analysis progress:
 
Analysis progress:
  
*Foil deflection studies[https://hallcweb.jlab.org/elogs/Hall+A+Moller/197]
+
*Kerr studies [https://hallcweb.jlab.org/elogs/Hall+A+Moller/210208_154754/First_Data_from_Kerr.pdf]
  
 
Connection details:
 
Connection details:
Line 32: Line 32:
 
---------
 
---------
 
Minutes
 
Minutes
 +
 +
Eric modified the simulation for CREX to be at beam energy 2.138 GeV instead of 2.2 GeV. This only changed the analyzing power by 0.03%. CREX actually ran at 2.183 GeV. He plans to run the sims again at the correct energy but expects little to no change.
 +
 +
Don went over the first results of Kerr.
 +
 +
Dave said he will work on getting the Moller Gem supports back to be included in the program. Eric will follow up with a rough diagram of where we want them that Dave can use to ask Robin for design time estimates.

Latest revision as of 16:52, 8 February 2021

Back to Main Page >> Moller Page >> Moller Weekly Meeting Index

previous meeting << >> following meeting


Moller DocDB

Original Moller Polarimeter Page

Moller ELog


Agenda:

Analysis progress:

  • Kerr studies [1]

Connection details:

Meeting URL https://bluejeans.com/388466836

Meeting ID 388 466 836

US toll free phone 1.888.240.2560

Dial in, type in the meeting ID and then press ##


Minutes

Eric modified the simulation for CREX to be at beam energy 2.138 GeV instead of 2.2 GeV. This only changed the analyzing power by 0.03%. CREX actually ran at 2.183 GeV. He plans to run the sims again at the correct energy but expects little to no change.

Don went over the first results of Kerr.

Dave said he will work on getting the Moller Gem supports back to be included in the program. Eric will follow up with a rough diagram of where we want them that Dave can use to ask Robin for design time estimates.