Difference between revisions of "May 21st 2021"
From Hall A Wiki
(Created page with "*Updates **HCAL HCal is ready to move and enpcamsonne is set up in Scott's office **GEM UVA In last week, we finished shielding for the bigbite layer. Tested with high voltage...") |
|||
(2 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
*Updates | *Updates | ||
**HCAL | **HCAL | ||
− | HCal is ready to move and enpcamsonne is set up in Scott's office | + | ***HCal is ready to move and enpcamsonne is set up in Scott's office |
+ | ***Jesse did walktrhough : approved moved | ||
+ | **Bigbite shower | ||
+ | ***fully decabled | ||
+ | ***Two baskets in front of rolling door needs to go | ||
+ | ***ethernet cables left | ||
+ | ***hodoscope cables | ||
+ | ***GRINCH and hodo have access | ||
+ | ***tedbbdaq : will be moved to Holly's office for now | ||
+ | ***Jessee did walkthrough too, has determined order will move HCAL first, | ||
+ | BB weldment, Cables basket, GRINCH electronics rack , BB front end electronic , BB detector stack last | ||
+ | *** time for move on Monday - have responsible of susbsystem around for move | ||
+ | **Bigbite hodoscope | ||
+ | ***all cables disconnected from frame and patch panels, in basket, still finishing cleaning up remaining cables | ||
+ | **GRINCH | ||
+ | ***Fully decabled | ||
+ | ***TDC cables disconnected | ||
+ | *** door closed | ||
+ | *** ADC cables in basket | ||
+ | **LHRS | ||
+ | ***To do list in HALOG | ||
+ | ***need 2 to 4 ADC, will check with Brad for the one we borrowed | ||
+ | **CDet | ||
+ | ***will discuss with engineering for mounting during Gep | ||
+ | ***new undergraduate : will work remotely, 1 on CDet | ||
+ | **GEM TEDF/INFN | ||
+ | ***no DAQ work but doing HV test so still using VME crate, will wrap up Friday | ||
**GEM UVA | **GEM UVA | ||
− | In last week, we finished shielding for the bigbite layer. Tested with high voltage. And now we are installing it to bigbite. | + | ***In last week, we finished shielding for the bigbite layer. Tested with high voltage. And now we are installing it to bigbite. |
+ | **Helicity | ||
+ | ***working on injector test, running on adaq3 for now ( might dedicate for 2.6.2 for now in apar) | ||
+ | ***working on getting helicity on intel | ||
+ | |||
+ | *DAQ computer status | ||
+ | **presentation by Ole | ||
+ | **latest Dell server about 35 K$ | ||
+ | |||
+ | *Counting | ||
+ | ** analysis in a-onl account | ||
+ | ** DAQ displays and scripts in adaq account | ||
+ | ** sbs-onl account will be ported from TEDF | ||
+ | ** LHRS is using adev account | ||
+ | |||
+ | *FARM use and MSS | ||
+ | **have sbs group and work disk | ||
+ | **need to get scripts to launch jobs on farm for running | ||
+ | **people should also install analysis on farm for running | ||
+ | ** need more disk work space ? work and volatile - need to check what - sbs has 10 TB quota on volatile, work 1 TB ( almost ) - raw files should go on volatile ! Need to evaluate what we need | ||
+ | **cache is different quota so should be ok for CODA files ( pin quota 40 TB on cache, Hall D has 800 TB ) |
Latest revision as of 11:43, 21 May 2021
- Updates
- HCAL
- HCal is ready to move and enpcamsonne is set up in Scott's office
- Jesse did walktrhough : approved moved
- Bigbite shower
- fully decabled
- Two baskets in front of rolling door needs to go
- ethernet cables left
- hodoscope cables
- GRINCH and hodo have access
- tedbbdaq : will be moved to Holly's office for now
- Jessee did walkthrough too, has determined order will move HCAL first,
- HCAL
BB weldment, Cables basket, GRINCH electronics rack , BB front end electronic , BB detector stack last
- time for move on Monday - have responsible of susbsystem around for move
- Bigbite hodoscope
- all cables disconnected from frame and patch panels, in basket, still finishing cleaning up remaining cables
- GRINCH
- Fully decabled
- TDC cables disconnected
- door closed
- ADC cables in basket
- LHRS
- To do list in HALOG
- need 2 to 4 ADC, will check with Brad for the one we borrowed
- CDet
- will discuss with engineering for mounting during Gep
- new undergraduate : will work remotely, 1 on CDet
- GEM TEDF/INFN
- no DAQ work but doing HV test so still using VME crate, will wrap up Friday
- GEM UVA
- In last week, we finished shielding for the bigbite layer. Tested with high voltage. And now we are installing it to bigbite.
- Helicity
- working on injector test, running on adaq3 for now ( might dedicate for 2.6.2 for now in apar)
- working on getting helicity on intel
- DAQ computer status
- presentation by Ole
- latest Dell server about 35 K$
- Counting
- analysis in a-onl account
- DAQ displays and scripts in adaq account
- sbs-onl account will be ported from TEDF
- LHRS is using adev account
- FARM use and MSS
- have sbs group and work disk
- need to get scripts to launch jobs on farm for running
- people should also install analysis on farm for running
- need more disk work space ? work and volatile - need to check what - sbs has 10 TB quota on volatile, work 1 TB ( almost ) - raw files should go on volatile ! Need to evaluate what we need
- cache is different quota so should be ok for CODA files ( pin quota 40 TB on cache, Hall D has 800 TB )