Line 2: Line 2:
 
**HCAL
 
**HCAL
 
***HCal is ready to move and enpcamsonne is set up in Scott's office
 
***HCal is ready to move and enpcamsonne is set up in Scott's office
 +
***Jesse did walktrhough : approved moved
 
**Bigbite shower
 
**Bigbite shower
 +
***fully decabled
 +
***Two baskets in front of rolling door needs to go
 +
***ethernet cables left
 +
***hodoscope cables
 +
***GRINCH and hodo have access
 +
***tedbbdaq : will be moved to Holly's office for now
 +
***Jessee did walkthrough too, has determined order will move HCAL first, 
 +
BB weldment, Cables basket, GRINCH electronics rack , BB front end electronic , BB detector stack last
 +
*** time for move on Monday - have responsible of susbsystem around for move
 
**Bigbite hodoscope
 
**Bigbite hodoscope
 +
***all cables disconnected from frame and patch panels, in basket, still finishing cleaning up remaining cables
 
**GRINCH
 
**GRINCH
 +
***Fully decabled
 +
***TDC cables disconnected
 +
*** door closed
 +
*** ADC cables in basket
 
**LHRS
 
**LHRS
 +
***To do list in HALOG
 +
***need 2 to 4 ADC, will check with Brad for the one we borrowed
 
**CDet
 
**CDet
**GEM TEDF
+
***will discuss with engineering for mounting during Gep
 +
***new undergraduate : will work remotely, 1 on CDet
 +
**GEM TEDF/INFN
 +
***no DAQ work but doing HV test so still using VME crate, will wrap up Friday
 
**GEM UVA
 
**GEM UVA
 
***In last week, we finished shielding for the bigbite layer. Tested with high voltage. And now we are installing it to bigbite.
 
***In last week, we finished shielding for the bigbite layer. Tested with high voltage. And now we are installing it to bigbite.
 +
**Helicity
 +
***working on injector test, running on adaq3 for now ( might dedicate for 2.6.2 for now in apar)
 +
***working on getting helicity on intel
  
 
*DAQ computer status
 
*DAQ computer status
 +
**presentation by Ole
 +
**latest Dell server about 35 K$
 +
 +
*Counting
 +
** analysis in a-onl account
 +
** DAQ displays and scripts in adaq account
 +
** sbs-onl account will be ported from TEDF
 +
** LHRS is using adev account
 +
 +
*FARM use and MSS
 +
**have sbs group and work disk
 +
**need to get scripts to launch jobs on farm for running
 +
**people should also install analysis on farm for running
 +
** need more disk work space ? work and volatile - need to check what - sbs has 10 TB quota on volatile, work 1 TB ( almost ) - raw files should go on volatile ! Need to evaluate what we need
 +
**cache is different quota so should be ok for CODA files ( pin quota 40 TB on cache, Hall D has 800 TB )

Latest revision as of 11:43, 21 May 2021

  • Updates
    • HCAL
      • HCal is ready to move and enpcamsonne is set up in Scott's office
      • Jesse did walktrhough : approved moved
    • Bigbite shower
      • fully decabled
      • Two baskets in front of rolling door needs to go
      • ethernet cables left
      • hodoscope cables
      • GRINCH and hodo have access
      • tedbbdaq : will be moved to Holly's office for now
      • Jessee did walkthrough too, has determined order will move HCAL first,

BB weldment, Cables basket, GRINCH electronics rack , BB front end electronic , BB detector stack last

      • time for move on Monday - have responsible of susbsystem around for move
    • Bigbite hodoscope
      • all cables disconnected from frame and patch panels, in basket, still finishing cleaning up remaining cables
    • GRINCH
      • Fully decabled
      • TDC cables disconnected
      • door closed
      • ADC cables in basket
    • LHRS
      • To do list in HALOG
      • need 2 to 4 ADC, will check with Brad for the one we borrowed
    • CDet
      • will discuss with engineering for mounting during Gep
      • new undergraduate : will work remotely, 1 on CDet
    • GEM TEDF/INFN
      • no DAQ work but doing HV test so still using VME crate, will wrap up Friday
    • GEM UVA
      • In last week, we finished shielding for the bigbite layer. Tested with high voltage. And now we are installing it to bigbite.
    • Helicity
      • working on injector test, running on adaq3 for now ( might dedicate for 2.6.2 for now in apar)
      • working on getting helicity on intel
  • DAQ computer status
    • presentation by Ole
    • latest Dell server about 35 K$
  • Counting
    • analysis in a-onl account
    • DAQ displays and scripts in adaq account
    • sbs-onl account will be ported from TEDF
    • LHRS is using adev account
  • FARM use and MSS
    • have sbs group and work disk
    • need to get scripts to launch jobs on farm for running
    • people should also install analysis on farm for running
    • need more disk work space ? work and volatile - need to check what - sbs has 10 TB quota on volatile, work 1 TB ( almost ) - raw files should go on volatile ! Need to evaluate what we need
    • cache is different quota so should be ok for CODA files ( pin quota 40 TB on cache, Hall D has 800 TB )