===  Near term work plan ===
 
===  Near term work plan ===
* Bigbite
+
* see the GEM commissioning run plan for GEn-II here: [https://docs.google.com/spreadsheets/d/1ONOpMdQAgFz6FKP5G605jyuHiWJ1Sv1HHhwWhHg7GnI/edit#gid=0]
* SBS
+
* SBS DAQ integration to GEn-II
+
* Online monitoring and SBS-offline preparation for GEn-II
+
* Documentation update
+
* CAEN HV Module paper work
+
  
  
 
* see the GEM commissioning run plan for GEn-II here: [https://docs.google.com/spreadsheets/d/1ONOpMdQAgFz6FKP5G605jyuHiWJ1Sv1HHhwWhHg7GnI/edit#gid=0]
 
 
* See installation plan for SBS here: [https://docs.google.com/presentation/d/1PRIdwXrCW0nQvuaufPRFt92eaUmA1Aev3Ty-5xexi4M/edit?usp=sharing plan]
 
** [photos from the hall https://hallaweb.jlab.org/wiki/index.php/File:Installation_Update_22June2022.pdf]
 
* Installation of HV dividers on BB: [https://docs.google.com/document/d/1yWlczu0QHQhMazwHK28gOAQgrXmz5YY5/edit#heading=h.gjdgxs work plan]
 
** [https://docs.google.com/spreadsheets/d/1QGkJZEgs3Uel5TfvR5iCwstGbNRv8rCM_hfFXXwRf2o/edit?usp=sharing BB APV Status]
 
 
* Thoughts on special run requests during GEn:
 
* Thoughts on special run requests during GEn:
 
** Luminosity studies (Nilanga)  
 
** Luminosity studies (Nilanga)  
 
** Full readout studies for negative pulse studies and etc (Sean)
 
** Full readout studies for negative pulse studies and etc (Sean)
 +
** HV efficiency scans with beam
 +
 +
===  Update on BB GEMs ===
 +
* Cosmic data taken this week and GEMs remain stable.
 +
* Ben investigating 3 ADC difference in CM calculation in the firmware.
 +
* Cleaning up online monitoring for GEn
  
 
=== Update on INFN GEM layers for GEn-RP ===
 
=== Update on INFN GEM layers for GEn-RP ===
* Ran up a new divider on the front layer GEM of the inline stack. Verified temperature and V/I consistent with divider run-up with no GEM. 
+
* Issue with APVs in SBS setup. Running disabled at the moment to stabilize DAQ.
* Currently in Hall. Plan to install new dividers on upstream-most layer while we can easily access. Will need sliding platform to remove the layer to install the new dividers on the second layer.
+
  
 
=== Update on UVa GEM layers for GEn-RP ===
 
=== Update on UVa GEM layers for GEn-RP ===
Line 34: Line 27:
 
* All layers/modules of SBS stack are operational and taking data.
 
* All layers/modules of SBS stack are operational and taking data.
 
* Further latency adjustments improved hits and efficiencies
 
* Further latency adjustments improved hits and efficiencies
 +
* Documentation update
 +
* CAEN HV Module paper work
 +
* Need to get an update on SBS gas system
 +
* Repositioning the scintillators
  
=== Update on BB GEMs ===
+
=== Update monitoring with new GEMs in GEn-RP ===
* Cosmic data taken this week and GEMs remain stable.
+
* Online monitoring and SBS-offline preparation for GEn-II
* Ben investigating 3 ADC difference in CM calculation in the firmware.
+
  
 
=== DAQ updates (Ben, Bryan, Alex) ===
 
=== DAQ updates (Ben, Bryan, Alex) ===
 +
* SBS DAQ integration to GEn-II

Latest revision as of 10:48, 14 September 2022

GMn GEM commissioning Meetings: WEDNESDAY 10:30am - 11:30am

Link to all previous meetings: GMn GEM Commissioning Meeting

Please use sbs_gems mailing list for plots/communications and HALOG entries relevant to GEMs!


Near term work plan

  • see the GEM commissioning run plan for GEn-II here: [1]


  • Thoughts on special run requests during GEn:
    • Luminosity studies (Nilanga)
    • Full readout studies for negative pulse studies and etc (Sean)
    • HV efficiency scans with beam

Update on BB GEMs

  • Cosmic data taken this week and GEMs remain stable.
  • Ben investigating 3 ADC difference in CM calculation in the firmware.
  • Cleaning up online monitoring for GEn

Update on INFN GEM layers for GEn-RP

  • Issue with APVs in SBS setup. Running disabled at the moment to stabilize DAQ.

Update on UVa GEM layers for GEn-RP

John:

  • All layers/modules of SBS stack are operational and taking data.
  • Further latency adjustments improved hits and efficiencies
  • Documentation update
  • CAEN HV Module paper work
  • Need to get an update on SBS gas system
  • Repositioning the scintillators

Update monitoring with new GEMs in GEn-RP

  • Online monitoring and SBS-offline preparation for GEn-II

DAQ updates (Ben, Bryan, Alex)