Difference between revisions of "ERR"
From Hall A Wiki
(→Agenda) |
(→GEp Experimental Readiness Review 2023) |
||
(3 intermediate revisions by 3 users not shown) | |||
Line 1: | Line 1: | ||
− | == Experimental Readiness Review 2023 == | + | == GEp Experimental Readiness Review 2023 == |
* '''Date:''' April 24 2023 (Monday) <br> | * '''Date:''' April 24 2023 (Monday) <br> | ||
* '''Location:''' L102 <br> | * '''Location:''' L102 <br> | ||
Line 21: | Line 21: | ||
* ''' GEp Proposal ''' ([https://hallaweb.jlab.org/collab/PAC/PAC32/PR12-07-109-Ratio.pdf]) | * ''' GEp Proposal ''' ([https://hallaweb.jlab.org/collab/PAC/PAC32/PR12-07-109-Ratio.pdf]) | ||
* ''' GEp Proposal Update ''' ([https://www.jlab.org/exp_prog/proposals/19/E12-07-109%20Update.pdf]) | * ''' GEp Proposal Update ''' ([https://www.jlab.org/exp_prog/proposals/19/E12-07-109%20Update.pdf]) | ||
+ | *[https://sbs.jlab.org/cgi-bin/DocDB/private/ShowDocument?docid=389 Committee Review report May 1 2023] | ||
*[https://sbs.jlab.org/DocDB/0003/000384/001/Report_on_Ecal_prototype_test-ver3.pdf Report on a prototype 16 block version of the ECAL in beam conditions] | *[https://sbs.jlab.org/DocDB/0003/000384/001/Report_on_Ecal_prototype_test-ver3.pdf Report on a prototype 16 block version of the ECAL in beam conditions] | ||
Line 36: | Line 37: | ||
| 8:35 || '''Charge Item 1, 4''': Design report including modifications to beamline, SBS and detectors([https://hallaweb.jlab.org/12GeV/SuperBigBite/documents/ERR2023/final/GEp_ERR_RW.pdf]) || Robin Wines (15+15) | | 8:35 || '''Charge Item 1, 4''': Design report including modifications to beamline, SBS and detectors([https://hallaweb.jlab.org/12GeV/SuperBigBite/documents/ERR2023/final/GEp_ERR_RW.pdf]) || Robin Wines (15+15) | ||
|- | |- | ||
− | | 9:05 || '''Charge Items 1b''': GEMs and associated electronics; ([https://hallaweb.jlab.org/wiki/images/ | + | | 9:05 || '''Charge Items 1b''': GEMs and associated electronics; ([https://hallaweb.jlab.org/wiki/images/8/8d/GEp_ERR_GEMs_%285%29.pdf]). || Holly Szumila-Vance (15+15) |
|- | |- | ||
| 9:35 || '''Charge Items 1c, 2a, 2b, and 6''': The simulation and data analysis software status for the experiment, GEM reconstruction efficiency at high rate ([https://sbs.jlab.org/DocDB/0003/000382/003/PuckettERR_GEP_FINALDRAFT_v2.pdf PDF]) || Andrew Puckett (25+25) | | 9:35 || '''Charge Items 1c, 2a, 2b, and 6''': The simulation and data analysis software status for the experiment, GEM reconstruction efficiency at high rate ([https://sbs.jlab.org/DocDB/0003/000382/003/PuckettERR_GEP_FINALDRAFT_v2.pdf PDF]) || Andrew Puckett (25+25) | ||
Line 62: | Line 63: | ||
|14:35 || '''Break''' || (15) | |14:35 || '''Break''' || (15) | ||
|- | |- | ||
− | |14:50 || '''Charge Item 8''': The beam commissioning procedures and polarimetry ([https://hallaweb.jlab.org/wiki/images/ | + | |14:50 || '''Charge Item 8''': The beam commissioning procedures and polarimetry ([https://hallaweb.jlab.org/wiki/images/d/d2/GEpERRbeamline-2.pdf pdf]) || William Henry (10+10) |
|- | |- | ||
|15:10 || '''Charge Item 3''': The responsibilities, manpower and other resources ([https://hallaweb.jlab.org/12GeV/SuperBigBite/documents/ERR2023/final/GEp-ERR-Personnel.pdf pdf]) || Mark Jones (10+10) | |15:10 || '''Charge Item 3''': The responsibilities, manpower and other resources ([https://hallaweb.jlab.org/12GeV/SuperBigBite/documents/ERR2023/final/GEp-ERR-Personnel.pdf pdf]) || Mark Jones (10+10) |
Latest revision as of 17:02, 1 May 2023
GEp Experimental Readiness Review 2023
- Date: April 24 2023 (Monday)
- Location: L102
- Zoom : Zoom link
- ERR Committee
- Nathan Baltzell (Computing Resources)
- Pavel Degtiarenko (Radiation)
- Sergey Furletov (GEM)
- William Gu (Electronics/DAQ/Slow Controls)
- Dave Meekins (Target)
- Bill Rainey (EHS)
- Yves Roblin (Beam Operation)
- Alexander Somov (Trigger)
- Stepan Stepanyan (Calorimeter+Coordinate Detector) Chair
- Simon Taylor (Simulations and data analysis)
- Beni Zihlmann (Polarimeter)
- Douglas Higinbotham (Observer)
- Ed Folts (Observer)
- Keith Welch (Observer)
- ERR Charge ([1])
- GEp Proposal ([2])
- GEp Proposal Update ([3])
- Committee Review report May 1 2023
- Report on a prototype 16 block version of the ECAL in beam conditions
Agenda
Morning | Session | ||
8:00 | Closed Session | (15) | |
8:15 | Remarks from Chair and Charge | Chair (5) | |
8:20 | Charge item 1: Experiment plan as approved by PAC47 ([4]) | BogdanW (10+5) | |
8:35 | Charge Item 1, 4: Design report including modifications to beamline, SBS and detectors([5]) | Robin Wines (15+15) | |
9:05 | Charge Items 1b: GEMs and associated electronics; ([6]). | Holly Szumila-Vance (15+15) | |
9:35 | Charge Items 1c, 2a, 2b, and 6: The simulation and data analysis software status for the experiment, GEM reconstruction efficiency at high rate (PDF) | Andrew Puckett (25+25) | |
10:25 | Break | (15) | |
10:40 | Charge Item 1d: ECAL calorimeter (pptxpdf) (Follow up ECal heating test slides) | Donald Jones (20+20) | |
11:20 | Charge Item 1f and 5: GEp experiment DAQ and Slow Controls (pdf) | Alex Camsonne(10+10) | |
11:40 | Charge Item 1f: Trigger based on fADC ([7]) | Ben Raydo (10+10) | |
12:00 | Lunch | (60) | |
Afternoon | Session | ||
13:00 | Charge Item 7, 9: RSAD, Safety Documents for GEp ([8]) | Evaristo Cisbani (10+10) | |
13:20 | Charge Item 1e: Coordinate Detector ([[9] pdf]) | Peter Monaghan (15+10) | |
13:45 | Charge Item 1a: Target and scattering chamber configuration ([10]) | S. Covrig Dusa (10+10) | |
14:05 | Charge Item 4: Installation ([11]) | Jessie Butler (15+15) | |
14:35 | Break | (15) | |
14:50 | Charge Item 8: The beam commissioning procedures and polarimetry (pdf) | William Henry (10+10) | |
15:10 | Charge Item 3: The responsibilities, manpower and other resources (pdf) | Mark Jones (10+10) | |
15:30 | Closed Session | (2 hours) | |
17:30 | Closeout | ||
Draft of COO ([12]) | |||
Draft of ERG ([13]) and chart ([14]) | |||
Draft of ESAD ([15]) | |||
RSAD Table from Radcon ([16]) | |||
OSP for Hadron Calorimeter, HCal-J ([17]) | |||
Draft of OSP for Coordinate Detector, CDet (pdf) | |||
OSP for GEM detectors (pdf) | |||
OSP for SBS and corrector magnets power supplies ([18]) | |||
OSP for SBS motioning and positioning system ([19]) | |||
DetailedSchedule_April2023 ([20]) |