Difference between revisions of "August 14th 2023"
From Hall A Wiki
(Created page with "*Updates *Discussion WAPP trigger") |
|||
(5 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
*Updates | *Updates | ||
+ | ** Shower | ||
+ | *** still need to start cosmics data, Kate is interested to help | ||
+ | ** HCAL | ||
+ | *** took cosmics, looks ok a few channels need to be check | ||
+ | *** could not work because of crate work | ||
+ | *** missing TDC might be due to noise - still investigating - will present Wednesday - pattern using pulser, looking in coincidence trigger | ||
+ | ** Hodoscope | ||
+ | *** Ralph could get into the hall last week | ||
+ | *** remote HV control was not working, power cycled the crate, power supply for NINO card it locked, need to check how to unlock it with Carlos | ||
+ | *** Hydra : some labeling added for HYDRA - some plots will not labeled - | ||
*Discussion WAPP trigger | *Discussion WAPP trigger | ||
+ | **Is trigger still set up ? (Mark) Most likely but need to be checked and timed in at the TS | ||
+ | **Is trigger adequate ? | ||
+ | ** standard trigger with higher threshold seems good enough | ||
+ | ** Proton trigger in BigBite | ||
+ | *** need to check thresholds and efficiency | ||
+ | *** 2.5 to 2.8 GeV, need to look at simulation | ||
+ | *** 200 to 500 MeV energy deposit ? | ||
+ | *** postpone plan | ||
+ | |||
+ | *** firware, might need to update firmware | ||
+ | *** ALL measurement, requires SBS GEMs in data stream | ||
+ | *** |
Latest revision as of 11:45, 14 August 2023
- Updates
- Shower
- still need to start cosmics data, Kate is interested to help
- HCAL
- took cosmics, looks ok a few channels need to be check
- could not work because of crate work
- missing TDC might be due to noise - still investigating - will present Wednesday - pattern using pulser, looking in coincidence trigger
- Hodoscope
- Ralph could get into the hall last week
- remote HV control was not working, power cycled the crate, power supply for NINO card it locked, need to check how to unlock it with Carlos
- Hydra : some labeling added for HYDRA - some plots will not labeled -
- Shower
- Discussion WAPP trigger
- Is trigger still set up ? (Mark) Most likely but need to be checked and timed in at the TS
- Is trigger adequate ?
- standard trigger with higher threshold seems good enough
- Proton trigger in BigBite
- need to check thresholds and efficiency
- 2.5 to 2.8 GeV, need to look at simulation
- 200 to 500 MeV energy deposit ?
- postpone plan
- firware, might need to update firmware
- ALL measurement, requires SBS GEMs in data stream