* SBS side LV:
 
* SBS side LV:
** Ellen to install some controller and readback (in progress)
+
** Ellen to network for browser access (in progress)
  
 
* SBS GEMs:
 
* SBS GEMs:
** techs to install final shielding block around the electronics hut
+
** Cosmics (in progress)
** Check low-levels, cosmics (in progress)
+
** Techs to install scintillators today
+
  
 
* BB GEMs:
 
* BB GEMs:
** Check low-levels, cosmics (in progress)
+
** Cosmics (in progress)
  
* Readout:
+
* Update the documentation on the HV and LV operations (in progress)
** Balance VTP fibers amongst crates to optimize (maybe not needed)
+
* Update the GEM reset GUI
 
+
* GEM experts on call (please sign up!)
* High voltage:
+
* Clean up our areas: move our stuff out of the Hall (done?)
** move HV to working reboot strip (done, but need add to documentation)
+
* Update channels in the alarm handler (status?)
** Add variables to accelerator to request for archiving (will do today)
+
* High voltage cables?! (status/tests?)
 
+
* Update the documentation on the HV and LV operations (before beam)
+
* GEM experts on call (setup before beam)
+
* Clean up our areas (in progress)
+

Latest revision as of 12:31, 9 April 2024

  • SBS side LV:
    • Ellen to network for browser access (in progress)
  • SBS GEMs:
    • Cosmics (in progress)
  • BB GEMs:
    • Cosmics (in progress)
  • Update the documentation on the HV and LV operations (in progress)
  • Update the GEM reset GUI
  • GEM experts on call (please sign up!)
  • Clean up our areas: move our stuff out of the Hall (done?)
  • Update channels in the alarm handler (status?)
  • High voltage cables?! (status/tests?)