Difference between revisions of "Noteable events list for d2n"
From Hall A Wiki
(New page: *Beam Pass Changes **February Media:Feb_beam_energy.png) |
m (→Major Changes) |
||
(13 intermediate revisions by 3 users not shown) | |||
Line 1: | Line 1: | ||
− | + | ===Beam Pass Changes=== | |
− | + | *February | |
+ | [[Image:Feb_beam_energy.png|800px]] | ||
+ | |||
+ | *March | ||
+ | [[Image:march_beam.png|800px]] | ||
+ | |||
+ | ===Major Changes=== | ||
+ | *02/05/09 | ||
+ | **18:05: 3He cell SAMANTHA and reference cell GMA installed | ||
+ | |||
+ | *02/07/09 | ||
+ | **18:43-21:52: BB CAMAC crate down | ||
+ | **22:29: BB TDC delay cables fixed(~360ns) | ||
+ | **22:29: BB Cer output widths on discriminator set to 100ns | ||
+ | |||
+ | *02/08/09 | ||
+ | **15:39: Oven temp controller replaced | ||
+ | **16:00: DAQ set to 1DAQ | ||
+ | **17:50: Ethane/Argon mix on pressure regulator at 1psi | ||
+ | |||
+ | *02/09/09 | ||
+ | **17:03: BB MWDC gas system pressures returned (Ethane/Argon) | ||
+ | |||
+ | *02/10/09 | ||
+ | **06:51: LHRS polarity set to positive | ||
+ | **09:44: BB sieve in | ||
+ | **10:29: BB Wire Chamber thresholds changed C1=3.9V,C2=4.8V,C3=4.8V | ||
+ | **11:17: T6:threshold_BB -s BB_Sh -120mV->450MeV | ||
+ | **11:17: T1:threshold_BB -s BB_Sh_2 -80V->300MeV | ||
+ | **11:31: PMTs put in flash ADCs | ||
+ | **14:10: sieve out | ||
+ | **14:16: PMTs back in V792 ADC | ||
+ | **16:35: RHRS DAQ restored for pvdis parasites | ||
+ | **17:55: BB T1,T6 thresholds set to -10mV | ||
+ | **18:15: BB polarity set to positive | ||
+ | **19:08: BB sieve in | ||
+ | **20:18: Threshold for BB_Sh=-0.120V BB_Sh_2=-0.080V BB_cer=-0.070V | ||
+ | **20:58: BB Cer T2 timing,outputs of AND units normalized to 150ns | ||
+ | **20:58: BB Cer T2 timing, output of P706 shortened to 50ns | ||
+ | **21:33: Compton HV = -1800V | ||
+ | |||
+ | *02/11/09 | ||
+ | **03:25: Sieve out | ||
+ | **08:20: BB and LHRS polarity changed to negative | ||
+ | **09:56: DAQ put in 2DAQ mode | ||
+ | **09:58: T3 T4 trigger cables unplugged from BB | ||
+ | **11:17: 0.3x attenuator added to photon signal going into Saclay DAQ (Compton) | ||
+ | **15:18: BB MWDC threshold change | ||
+ | ***front = 3.898 | ||
+ | ***mid = 4.800 | ||
+ | ***back = 4.800 | ||
+ | **22:56: Sync problems in ROC4, slot 18 (1875 TDC) missing gates in buffer mode | ||
+ | |||
+ | *02/12/09 | ||
+ | **8:30: North Linac access | ||
+ | **12:01: Cell MOSS prepared | ||
+ | **14:54: LHRS FrontEnd Busy set to 60us | ||
+ | **16:17: Changed scintillator HV by 10% | ||
+ | **16:47: Trigger Latch Pattern Map updated | ||
+ | **17:52: ADC data ready wait loop changed from 1000 to 10000 | ||
+ | |||
+ | *02/13/09 | ||
+ | **20:47: BB Cer 1pe adjusted to 50mV | ||
+ | **21:15: BB cer signals moved to chan 32-63 of 1881 ADC in ROC8 slot 9 | ||
+ | **22:05: BB disc. group signal now 30ns(signal that is AND with shower) | ||
+ | **23:02: shift BB retime L1A by 25ns | ||
+ | **23:41: Hole in T6 trigger | ||
+ | |||
+ | *02/14/09 | ||
+ | **00:24: BB_sh T6 thresh -80mV | ||
+ | **00:47: Removed T1 from BB datamon | ||
+ | |||
+ | *02/15/09 | ||
+ | **08:24: BB shower summing module overloaded, moved summing module to new crate | ||
+ | **08:24: Disc. of T1 shower sum #16 gets no signal | ||
+ | **08:24: T1 trigger on shower sum #19 flaky cable | ||
+ | |||
+ | *02/16/09 | ||
+ | **01:06: T6 threshold set to -120mV | ||
+ | |||
+ | *02/17/09 | ||
+ | **01:35: Controlled access for magnet | ||
+ | **12:20: 20ns added to BB cer group timing at shower group AND for T2 | ||
+ | **12:28: PMTs 1--8 and 11--18 split between 1881 and FADC | ||
+ | **19:02: Replaced bbps1 portserver | ||
+ | **Runs 1510-1512 had some MWDC HV turned off | ||
+ | |||
+ | *02/18/09 | ||
+ | **15:06: Access to fix Moller quad | ||
+ | |||
+ | *02/19/09 | ||
+ | **13:26: BB T6 thresh = -133mV | ||
+ | |||
+ | *02/20/09 | ||
+ | **09:20: BB in Buf mode | ||
+ | **14:05: Moved bbsfi2, bbsfi3 to their own network switch and port | ||
+ | **14:58: Preshower sum input line swapped for left and right | ||
+ | **23:23: BB in Buf FADC mode | ||
+ | |||
+ | *02/27/09 | ||
+ | **07:17: HV for channel bbps1:2002 S10, L10.0 was off Turned it on (affects run 1861-1882) | ||
+ | **21:37: It turns out that bbps1:2002 S10, L10.0 was supposed to be off. I turned it back off after Run 1882 finished. | ||
+ | |||
+ | |||
+ | *03/01/09 | ||
+ | **03:56: Adjusted T2 arrival time at TS | ||
+ | **03:56: 27 4ns cables added between PSh disc. and P758 | ||
+ | **03:56: T1 plugged back into TS | ||
+ | **06:07: T2 delay taken out | ||
+ | **22:18: Lasers off | ||
+ | **23:15: CHL trip | ||
+ | |||
+ | *03/02/09 | ||
+ | **13:53: Left dipole changed to positive polarity | ||
+ | **19:27: BB power supply water leak | ||
+ | **19:40: BB set ot 710A | ||
+ | |||
+ | *03/03/09 | ||
+ | **10:53: C4F8O BB Cer swapped | ||
+ | **12:09: BB_Sh, BB_Sh2 set to -110 | ||
+ | **18:23: RICH gas supply changed from methane to UHP grade Nitrogen | ||
+ | |||
+ | *03/04/09 | ||
+ | **08:02: LHRS polarity changes | ||
+ | ***Q1 = negative | ||
+ | ***Q2 = positive | ||
+ | ***Q3 = negative | ||
+ | ***Dipole NMR = N | ||
+ | |||
+ | *03/05/09 | ||
+ | **12:49: Arc magnet problem | ||
+ | |||
+ | *03/06/09 | ||
+ | |||
+ | *03/07/09 | ||
+ | |||
+ | *03/09/09 | ||
+ | **10:41: BB & LHRS changed to positive polarity | ||
+ | **11:13: PMTs 9/10 bypass first amplifier | ||
+ | **11:208: T1 threshold set to -20mV | ||
+ | **17:02: PSh/Sh set to OR T6 cosmics | ||
+ | **20:38: PSh/Sh set to AND T6 back to Sh AND PSh | ||
+ | **22:02: PSh/Sh set to OR T6 cosmics | ||
+ | |||
+ | *03/10/09 | ||
+ | **01:33: PSh/Sh set to AND T6 back to Sh AND PSh | ||
+ | |||
+ | *03/11/09 | ||
+ | **11:22: BB set to negative polarity | ||
+ | **14:23: PSh/Sh set to OR T6 cosmics | ||
+ | |||
+ | *03/12/09 | ||
+ | **22:33: PMTs 9/10 put back into double amplifier | ||
+ | |||
+ | *03/13/09 | ||
+ | **08:10: LHRS set to negative polarity | ||
+ | |||
+ | *03/14/09 | ||
+ | **08:30: 3He oven base went down | ||
+ | **17:31: Base heater voltage reduced 140V->125V and air flow raised 220->300 | ||
+ | |||
+ | *03/15/09 | ||
+ | **02:16: BB Sh threshold set to -20mV | ||
+ | **02:47: BB Sh threshold set to -110mV | ||
+ | **20:40: BB set to positive polarity | ||
+ | |||
+ | *03/16/09 | ||
+ | **08:44: BB set to negative polarity |
Latest revision as of 12:40, 1 October 2010
Beam Pass Changes
- February
- March
Major Changes
- 02/05/09
- 18:05: 3He cell SAMANTHA and reference cell GMA installed
- 02/07/09
- 18:43-21:52: BB CAMAC crate down
- 22:29: BB TDC delay cables fixed(~360ns)
- 22:29: BB Cer output widths on discriminator set to 100ns
- 02/08/09
- 15:39: Oven temp controller replaced
- 16:00: DAQ set to 1DAQ
- 17:50: Ethane/Argon mix on pressure regulator at 1psi
- 02/09/09
- 17:03: BB MWDC gas system pressures returned (Ethane/Argon)
- 02/10/09
- 06:51: LHRS polarity set to positive
- 09:44: BB sieve in
- 10:29: BB Wire Chamber thresholds changed C1=3.9V,C2=4.8V,C3=4.8V
- 11:17: T6:threshold_BB -s BB_Sh -120mV->450MeV
- 11:17: T1:threshold_BB -s BB_Sh_2 -80V->300MeV
- 11:31: PMTs put in flash ADCs
- 14:10: sieve out
- 14:16: PMTs back in V792 ADC
- 16:35: RHRS DAQ restored for pvdis parasites
- 17:55: BB T1,T6 thresholds set to -10mV
- 18:15: BB polarity set to positive
- 19:08: BB sieve in
- 20:18: Threshold for BB_Sh=-0.120V BB_Sh_2=-0.080V BB_cer=-0.070V
- 20:58: BB Cer T2 timing,outputs of AND units normalized to 150ns
- 20:58: BB Cer T2 timing, output of P706 shortened to 50ns
- 21:33: Compton HV = -1800V
- 02/11/09
- 03:25: Sieve out
- 08:20: BB and LHRS polarity changed to negative
- 09:56: DAQ put in 2DAQ mode
- 09:58: T3 T4 trigger cables unplugged from BB
- 11:17: 0.3x attenuator added to photon signal going into Saclay DAQ (Compton)
- 15:18: BB MWDC threshold change
- front = 3.898
- mid = 4.800
- back = 4.800
- 22:56: Sync problems in ROC4, slot 18 (1875 TDC) missing gates in buffer mode
- 02/12/09
- 8:30: North Linac access
- 12:01: Cell MOSS prepared
- 14:54: LHRS FrontEnd Busy set to 60us
- 16:17: Changed scintillator HV by 10%
- 16:47: Trigger Latch Pattern Map updated
- 17:52: ADC data ready wait loop changed from 1000 to 10000
- 02/13/09
- 20:47: BB Cer 1pe adjusted to 50mV
- 21:15: BB cer signals moved to chan 32-63 of 1881 ADC in ROC8 slot 9
- 22:05: BB disc. group signal now 30ns(signal that is AND with shower)
- 23:02: shift BB retime L1A by 25ns
- 23:41: Hole in T6 trigger
- 02/14/09
- 00:24: BB_sh T6 thresh -80mV
- 00:47: Removed T1 from BB datamon
- 02/15/09
- 08:24: BB shower summing module overloaded, moved summing module to new crate
- 08:24: Disc. of T1 shower sum #16 gets no signal
- 08:24: T1 trigger on shower sum #19 flaky cable
- 02/16/09
- 01:06: T6 threshold set to -120mV
- 02/17/09
- 01:35: Controlled access for magnet
- 12:20: 20ns added to BB cer group timing at shower group AND for T2
- 12:28: PMTs 1--8 and 11--18 split between 1881 and FADC
- 19:02: Replaced bbps1 portserver
- Runs 1510-1512 had some MWDC HV turned off
- 02/18/09
- 15:06: Access to fix Moller quad
- 02/19/09
- 13:26: BB T6 thresh = -133mV
- 02/20/09
- 09:20: BB in Buf mode
- 14:05: Moved bbsfi2, bbsfi3 to their own network switch and port
- 14:58: Preshower sum input line swapped for left and right
- 23:23: BB in Buf FADC mode
- 02/27/09
- 07:17: HV for channel bbps1:2002 S10, L10.0 was off Turned it on (affects run 1861-1882)
- 21:37: It turns out that bbps1:2002 S10, L10.0 was supposed to be off. I turned it back off after Run 1882 finished.
- 03/01/09
- 03:56: Adjusted T2 arrival time at TS
- 03:56: 27 4ns cables added between PSh disc. and P758
- 03:56: T1 plugged back into TS
- 06:07: T2 delay taken out
- 22:18: Lasers off
- 23:15: CHL trip
- 03/02/09
- 13:53: Left dipole changed to positive polarity
- 19:27: BB power supply water leak
- 19:40: BB set ot 710A
- 03/03/09
- 10:53: C4F8O BB Cer swapped
- 12:09: BB_Sh, BB_Sh2 set to -110
- 18:23: RICH gas supply changed from methane to UHP grade Nitrogen
- 03/04/09
- 08:02: LHRS polarity changes
- Q1 = negative
- Q2 = positive
- Q3 = negative
- Dipole NMR = N
- 08:02: LHRS polarity changes
- 03/05/09
- 12:49: Arc magnet problem
- 03/06/09
- 03/07/09
- 03/09/09
- 10:41: BB & LHRS changed to positive polarity
- 11:13: PMTs 9/10 bypass first amplifier
- 11:208: T1 threshold set to -20mV
- 17:02: PSh/Sh set to OR T6 cosmics
- 20:38: PSh/Sh set to AND T6 back to Sh AND PSh
- 22:02: PSh/Sh set to OR T6 cosmics
- 03/10/09
- 01:33: PSh/Sh set to AND T6 back to Sh AND PSh
- 03/11/09
- 11:22: BB set to negative polarity
- 14:23: PSh/Sh set to OR T6 cosmics
- 03/12/09
- 22:33: PMTs 9/10 put back into double amplifier
- 03/13/09
- 08:10: LHRS set to negative polarity
- 03/14/09
- 08:30: 3He oven base went down
- 17:31: Base heater voltage reduced 140V->125V and air flow raised 220->300
- 03/15/09
- 02:16: BB Sh threshold set to -20mV
- 02:47: BB Sh threshold set to -110mV
- 20:40: BB set to positive polarity
- 03/16/09
- 08:44: BB set to negative polarity