Difference between revisions of "Lead glass cal."

From Hall A Wiki
Jump to: navigation, search
 
(2 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
*from the patch there are two sets of signals that go to the V792 QDC:
 
*from the patch there are two sets of signals that go to the V792 QDC:
  1. The ADC cables. Approx. 170ns
+
  1. The ADC cables. (ribbon cables) Approx. 170ns
  2.
+
  2. The lead glass trigger cables. They are processed through a discriminator
 +
    and a sequence of logic units followed by a short delay and then the translator.
 +
    It is then connected to the V792 by a ribbon cable. The signal reaches the
 +
    V792 QDC about 20-30ns before the ADC cables.
 +
 
 +
[[Image:caladc.jpg]]

Latest revision as of 13:14, 26 October 2010

  • from the patch there are two sets of signals that go to the V792 QDC:
1. The ADC cables. (ribbon cables) Approx. 170ns
2. The lead glass trigger cables. They are processed through a discriminator 
   and a sequence of logic units followed by a short delay and then the translator. 
   It is then connected to the V792 by a ribbon cable. The signal reaches the 
   V792 QDC about 20-30ns before the ADC cables.

Caladc.jpg